Browse
Search
2019-027-E AMS - Sasser Link Building remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-027-E AMS - Sasser Link Building remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:04:29 PM
Creation date
1/28/2019 10:03:13 AM
Metadata
Fields
Template:
Contract
Date
1/19/2019
Contract Starting Date
1/19/2019
Contract Ending Date
3/31/2019
Contract Document Type
Agreement - Construction
Amount
$28,000.00
Document Relationships
R 2019-027 AMS - Sasser Companies Link Building remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1EDCDF34-B900-4362-87B8-OA1047DE941C <br /> Orange County <br /> John Link Government Services Center <br /> 200 South Cameron Street <br /> Hillsborough, NC. 27278 <br /> January 17, 2018 <br /> GENERAL CONDITIONS <br /> All work to be completed outside of normal business hours <br /> Site supervision <br /> Clean up <br /> Ceiling plenum above the rooms to be addressed <br /> Lower Level: room 231, room 215, room 218, room 232, room 241, <br /> Upper Level: Mr. Roberts office, the reception office, and room 105 <br /> Containment <br /> Material and labor to contain the exterior facing drywall (where signs of water damage <br /> and fungal growth are present) above the offices mentioned above. <br /> Material and labor to lay containment plastic (and secure to the exterior wall and ceiling <br /> as needed) across the dropped ceiling above these areas at least four feet out from the <br /> exterior wall. <br /> Quote includes containment completed above ceiling in Mr. Roberts office on 1/15/19. <br /> Air Filtration Devices (AFD'S) <br /> Material and labor to install Six 500 CFM air filtration devices (AFD's) above the dropped <br /> ceiling in the areas of concern based on HVAC zoning and office proximity. AFD's to be <br /> suspended from bar joists using Unistrut, threaded rod and 1/4" plywood. <br /> Quote includes One 1400 CFM AFD placed in Mr. Roberts office on 1/15/19. <br /> Electrical <br /> Material and labor to install one dedicated circuit and receptacles as needed on lower level and <br /> upper level above the dropped ceiling to power AFD's. <br /> ITEMS NOT INCLUDED <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.