Browse
Search
2011-356 Co Manager - TJCOG electric vehicle charging stations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Triangle J Council of Governments
>
2011-356 Co Manager - TJCOG electric vehicle charging stations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2014 3:32:14 PM
Creation date
1/23/2019 11:59:22 AM
Metadata
Fields
Template:
BOCC
Date
11/15/2011
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5i
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NETL F 451.1 -1/3 <br />(11/2007) OPI =320 <br />(Page 6) U.S. DEPARTMENT OF ENERGY <br />ENVIRONMENTAL QUESTIONNAIRE <br />5. Historical/Cultural Resources <br />a. Describe any historical, archaeological, or cultural sites in the vicinity of the proposed project; note any sites included <br />on the National Register of Historic Places. ❑ None <br />b. Would construction or operational activities planned under the proposed project disturb any historical, archaeological, <br />or cultural sites? ❑ No planned construction ❑ No historic sites ❑ Yes (describe) ❑ No Impact (discuss) <br />C. Has the State Historic Preservation Office been contacted with regard to this project? p No ❑ Yes (describe) <br />d. Would the proposed project interfere with visual resources (e.g., eliminate scenic views) or alter the present <br />landscape? ❑ No ❑ Yes (describe) <br />For allproposedproject work activities identified under item A -7b, respond to item D6 directly below and continue <br />filling out environmental questionnaire. <br />6. Atmospheric Conditions /Air Quality <br />a. Identify air quality conditions in the immediate vicinity of the proposed project with regard to attainment of National <br />Ambient Air Quality Standards (NAAQS). This information is available under the Green Book Non - Attainment Areas <br />for Criteria Pollutants located at hLtp: / /epa.gov.oar /oggps /zreenbk or hLtp: / /www.epa.gov /air /oMps /2reenbk/astate.htmi <br />b. Would proposed project require issuance of new or modified local, state, or federal air permits to perform project <br />related work and activities? ❑ No 0 Yes (describe) <br />C. Would the proposed project be in compliance with local and state air quality requirements? ❑ No (explain) ❑ Yes <br />d. Would the roposed project be classified as either a New Source or a major modification to an existing source? <br />F1 No Yes (describe) <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.