Browse
Search
Agenda - 10-21-2004-1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 10-21-2004
>
Agenda - 10-21-2004-1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2018 9:00:38 AM
Creation date
8/29/2008 10:25:13 AM
Metadata
Fields
Template:
BOCC
Date
10/21/2004
Document Type
Agenda
Agenda Item
1
Document Relationships
Minutes - 20041021
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• More specifically define future projects that may need to be built in order to ensure site <br />availability at the appropriate time <br />16 0 Southern Orange Senior Center <br />• Programming on -going with planning committee <br />• Community Design Committee (CDC) review completed 10 -20 -04 <br />• On track to be completed by June 30, 2006 <br />17 L] Central Orange Senior Center <br />• Changes <br />• None from original study <br />to 0 Northern Human Services Center <br />• Changes <br />Include Task Force recommendations Into the revised facilities plan <br />• Funding <br />• Infrastructure development currently funded with additional funds from 2/3 Net Debt Bonds <br />forthcoming <br />is 0 Parks Operations /Storage Facility <br />• Not included in original space study <br />• Located at Public Works facility, Hwy86N <br />• Project currently under design <br />• Funding: <br />• $675,000 In current CIP <br />• Targeted completion by August 1,2005 <br />20 O Moving Forward <br />• Convene reconstituted study group <br />• Two (2) BQCC representatives <br />• Small work group (DTCC staff work group suggested) <br />• Involves all department heads and key staff <br />210 Moving Forward <br />• Concentrated timeline for revised study <br />• Five major meetings <br />• PRELIMINARY recommendations targeted for completion mid - January 2005 <br />• Final report targeted for completion March 2005 <br />220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.