Browse
Search
2010-162 Planning - Town of Hillsborough Stormwater Program Management & Erosion Control Services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Hillsborough
>
2010-162 Planning - Town of Hillsborough Stormwater Program Management & Erosion Control Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 8:32:41 AM
Creation date
1/23/2019 11:46:21 AM
Metadata
Fields
Template:
Contract
Date
12/6/2010
Contract Starting Date
10/1/2010
Contract Ending Date
10/15/2011
Contract Document Type
Agreement
Agenda Item
4k
Amount
$20,175.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Hillsborough Stormwater Management Program <br />Work Plan September 2010 <br />5. Post-Construction Stormwater Management <br />• .. .. <br />-- .. • <br />New Development Review proposed new development projects to ensure compliance with the Town's SRO <br />Review stormwater post-construction requirements <br /> Inspect new structural stormwater BMPs at the time the project is complete to ensure SRO <br />OCED <br /> compliance with approved plans , <br /> Map new BMPs using GPS/GIS technology SRO, OCED <br />BMP Inspections Review required annual inspection reports submitted by the BMP the owner SRO <br /> Conduct follow-up inspections as warranted and provide inspection reports to owner SRO <br />OCED <br /> outlining follow up actions , <br /> Issue notice of violations if warranted SRO, Hillsborough <br />Education/Outreach This portion of the post-construction stormwater management program is part of the SRO <br />OCED <br /> overall education/outreach component described in items 1 and 2 above , <br /> Identify at least one new possible stormwater retro-fit location annually SRO <br /> Evaluate sites already identified based on land availability, willing ownership, potential SRO <br /> for pollution reductions, and other pertinent variables <br />Retro-fit Opportunities Rank these sites and evaluate grant availability and/or other funding sources to SRO <br /> implement retro-fits <br /> Provide this information to the state and identify potential partnerships to develop and SRO <br /> fund retro-fit projects <br /> Through an inter-local agreement, the Orange County Erosion Control Division <br /> reviews and approves stormwater management plans for new development. An <br /> electronic database is maintained on each permitted site including inspection reports. <br />Evaluation Information regarding number of plans reviewed, BMP inspections and other pertinent OCED <br /> information is tracked and will be included in the annual report to the state for <br /> development within the Town's jurisdiction. Orange County also provides this <br /> information to NCDWQ pursuant to their Neuse stormwater program. <br />Page 23 of 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.