Browse
Search
2005 Planning - Town of Hillsborough for National Pollutant Discharge Elimination System Phase II services
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Hillsborough
>
2005 Planning - Town of Hillsborough for National Pollutant Discharge Elimination System Phase II services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 2:54:52 PM
Creation date
1/23/2019 11:29:58 AM
Metadata
Fields
Template:
BOCC
Date
3/13/2006
Meeting Type
Work Session
Document Type
Agreement
Agenda Item
4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~D ~ ~ [~ ~J' 3.0 18 <br />A3) -EXCLUDED FUNCTIONS <br />Notwithstanding any provision of the Interlocal Agreement, or the provisions of the Annual <br />Workplan, the Services to be provided by the County shall not include the following: <br />1. LEGAL MECHANISIMS TO IMPLEMENT PERMIT -COUNTY will NOT be <br />responsible for the adoption of legal mechanisms, such as regulations, ordinances, <br />policies and procedures to prohibit illicit connections, spills and illegal dumping into the <br />Towns Municipal Separate Storm Sewer System or to otherwise implement the <br />provisions of the Permit. <br />2. MAINTENANCE OF ADEQUATE FUNDING AND STAFFING -COUNTY will NOT <br />be responsible for the TOWN's responsibility under the Permit to maintain adequate <br />funding and staffing to implement and manage the provisions of the Permit. <br />3. STORM DRAIN SYSTEM INVENTORY -COUNTY will NOT be responsible for <br />identification or location of pipes, outfalls, basins, or other storm water treatment or <br />conveyance devices, nor their receiving waters. <br />4. STORM DRAIN SYSTEM MAPPING -COUNTY will NOT be responsible for <br />developing a map containing the location of pipes, outfalls, basins, or other storm water <br />treatment or conveyance devices, nor their receiving waters. If made available to <br />COUNTY in an acceptable format, COUNTY may choose to make this information <br />available on COUNTY'S GIS system. <br />5. STORM DRAIN SYSTEM MAINTENANCE -COUNTY will NOT be responsible for <br />installation or maintenance of any pipes, outfalls, basins, or other storm water treatment <br />or conveyance devices, nor their receiving waters. <br />6. SOIL EROSION & SEDIMENTATION CONTROL FOR PUBLICLY FUNDED <br />PROJECTS -All publicly funded projects fall under the jurisdiction of the North <br />Carolina Division of Land Resources, Land Quality Section. <br />7. IMPLEMENTATION OF RECOMMENDED STORMWATER BEST MANAGEMENT <br />PRACTICES FOR TOWN FACILITIES -COUNTY will NOT be responsible for the <br />installation, maintenance, or execution of any stormwater management structures or <br />practices. <br />8. LAB COSTS ASSOCIATED WITH SAMPLING THAT MAY BE NECESSARY FOR <br />ILLICIT DISCHARGE ELIMINATION AND DETECTION -COUNTY will NOT be <br />responsible for any water quality sample collection or analysis costs. <br />9. MODIFICATIONS TO THE PERMIT -COUNTY will NOT be responsible for any <br />implementation provisions of the Permit that result from modification of the Permit by <br />Page 18 of 13 <br />Isg:orangecounty\030906 Draft Phase II Agreement to Town.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.