Browse
Search
2003 NS Proposed Addenda to Interlocal Agreement on CHCCS High School #3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Chapel Hill
>
2003 NS Proposed Addenda to Interlocal Agreement on CHCCS High School #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 4:43:18 PM
Creation date
1/23/2019 11:22:35 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Document <br />Page 8 of 8 <br />~8 <br />• Design and select materials that generate less noise and those that dampen noise during the <br />construction process <br />• Reduce noise generating equipment so that the maximum decibel reading level at the property line <br />is SOdb <br />• Meet all local noise ordinances <br />Commissioning <br />A. Training <br />• Provide training to all employees about. the systems that exits, these include the following: <br />• HVAC systems <br />• Lighting systems <br />• Plumbing and water conservation systems <br />• CO2, temperature, and other monitoring systems <br />• Passive or active solar, geo-thermal or bio mass systems <br />• Irrigation systems <br />• Control and management systems <br />B. Review <br />• Provide all stakeholders with review opportunities before occupancy of the building <br />• Provide all stakeholders with an opportunity to review the building after one year of occupancy <br />• Provide data concerning temperature, humidity and energy consumption to all stakeholders after 1 <br />month, 6 months, 12 months and 24 months <br />• Require all stakeholders to use HPS features as designed or to report problems immediately to <br />responsible authorities. <br />Each architect and contractor employed by the Board of Education shall provide the Board with written <br />documentation verifying their compliance with the guidelines presented both during the planning and <br />construction phase of the building. Architects and contractors will provide at the bidding phase their <br />experience related to high performance school standards. If, due to the issue of excessive costs or site <br />issues, a guideline cannot be met, the architect or contractor must submit written justification to the <br />Superintendent or designee as well as any alternative plans to reach the desired outcome. Architects and <br />contractors are also required to meet the requirements of Policy 9010- Site Selection and Policy 9020- <br />Facility Design. <br />Chapel Hill-Carrboro City Schools <br />http://nt5. scbbs.com/cgi-bin/om_isapi.dll?clientID=546502&depth=2&infobase=chaphill.n... 8/11 /2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.