Browse
Search
2003 NS Proposed Addenda to Interlocal Agreement on CHCCS High School #3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Chapel Hill
>
2003 NS Proposed Addenda to Interlocal Agreement on CHCCS High School #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 4:43:18 PM
Creation date
1/23/2019 11:22:35 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Document, Page 5 of 8 <br />. IS <br />well water or storm water runoff. <br />• Limit landscape irrigation and use drought resistant plants <br />3.2 Wastewater Technology <br />• Reduce municipally provided potable water for building sewage flow by using gray water or <br />waterless fixtures <br />3.3 Water Use Reduction <br />• Reduce aggregate water use by a minimum of 20% than the base, not including irrigation, after <br />meeting EPA 1992 fixture performance requirements. Smith Middle and Scroggs Elementary would <br />provide baseline use data. <br />Energy and Atmosphere <br />4.1 Minimum Energy Performance <br />• Design building to meet ASHRAE/IESNA 90.1, state or local energy codes, whichever is more <br />stringent <br />4.2 CFC Reduction <br />• Zero use of CFC-based refrigerants in HVAC systems <br />• Check for other CFC materials, products and systems and make sure that all are CFC-free <br />4.3 Optimal Energy Efficiency <br />• Increase energy performance by a minimum of 20% in new buildings and 10% in existing <br />structures above those described in 4.1. as demonstrated by simulation using Energy Cost Budget <br />Method described in section 11 of ASHRAE/IESNA 90.1 <br />4.4 Renewable Energy <br />• During building design, consider the use of high temperature solar or geothermal assisted <br />technologies to provide a portion of the total energy use of the building <br />Material and Resources <br />5.1 Storage and Collection of Recyclables <br />• Provide an easily accessible location that serves the entire building for the collection, separation <br />and storage of recyclables <br />5.3 Construction Waste Management <br />• During the design process, develop a checklist that focuses on the reduction of construction waste <br />from a design function <br />• Develop a waste management plan that includes a reuse area, recycling area for separation, and a <br />lunch area that provides for recycling <br />• Recycle or salvage at least 75% of grading and clearing debris by weight <br />http://nt5.scbbs.com/cgi-bin/om isapi.dll?clientID=546502&depth=2&infobase=chaphill.n... 8/11/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.