Browse
Search
2003 NS Proposed Addenda to Interlocal Agreement on CHCCS High School #3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Chapel Hill
>
2003 NS Proposed Addenda to Interlocal Agreement on CHCCS High School #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2011 4:43:18 PM
Creation date
1/23/2019 11:22:35 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2003
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Document Page 4 of 8 <br />14 <br />• Stockpile topsoil for later use <br />• Prevent sedimentation from entering sewers or stream <br />2.2 Site Selection <br />• Provide 100 foot buffers from any wetland area and 50 feet from any free flowing water streams <br />• Building can be sited no lower than 5 feet above the 100 year flood plain <br />• Avoid agricultural land as defined by the Farmland Trust <br />• Avoid land with extreme slopes or hill <br />2.5 Alternative Transportation <br />• Locate building within 1/2 mile of an existing or planned trail, greenway, bikeway or bus line <br />• Provide bike racks and storage for 10% of the building occupants if appropriate <br />• Provide preferred parking for carpools and alternative vehicles <br />• Provide easy bike and pedestrian access to the building site <br />2.6 Site Disturbance <br />• Preserve a minimum of 30% of the site in undeveloped space if possible without reducing <br />programmatic features of the school <br />• Ensure that any cultural landmarks as identified by the state or local government remain <br />undisturbed <br />2.7 Stormwater Management <br />• Implement a stormwater management plan that does not increase the rate or quantity of runoff from <br />the site <br />2.8 Heat Islands <br />• Provide shade (within 5 years) on at least 30% of non-roof impervious surface on the site or use an <br />open grid pavement system, with less than 50% impervious surface, for 50% of the parking area <br />• Use high reflectance and low emissivity roofing on 75% of the roof area <br />2.9 Light Pollution <br />• On school maintained and controlled land, design exterior lighting that the cutoff angle does not <br />exceed 45% <br />• Design lighting to prevent reflection onto another property <br />Water <br />3.1 Water Efficient Landscaping <br />• Reduce potable water consumption used for landscape irrigation by 50% by using drip systems, <br />http://nt5.scbbs.com/cgi-bin/om_isapi.dll?clientID=546502&depth=2&infobase=chaphill.n... 8/11 /2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.