Browse
Search
2001 Planning - Carrboro Chapel Hill Joint Planning Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
Interlocal Agreements
>
Various
>
2001 Planning - Carrboro Chapel Hill Joint Planning Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2012 9:22:30 AM
Creation date
1/23/2019 11:20:03 AM
Metadata
Fields
Template:
BOCC
Date
12/3/2010
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
9c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACPIlVIENT "B" <br />Water and Sewer Management <br />Planning and Boundary Agreement <br />or system modification, flow reduction or other measures <br />caleulatedto improve functionality of the system. <br />2. In the case of an .existing well water supply system(s), it meets <br />all of the following criteria: <br />• the well water supply system. is contuninated with <br />a microbial, chemical or other agent which is <br />known to cause disease. or other serious health <br />effects; <br />0 the well water supply system is not reparable to the <br />.point where the contamination can be eliminated; <br />• the water from the well water supply system is not <br />treatable prior to withdrawal to the point where the <br />threat of disease or serious health effects is <br />eliminated; <br />there. is no alternate location on-site for a new well <br />water supply system which can be pemutted under <br />Orange County Health. Department regulatory <br />criteria in effect at the time of the contamination or <br />an alternative site. is unacceptable because <br />widespread existence of contamination or because. <br />of the potential of contaminant migration to the <br />alternate site. <br />The following tenors used in the criteria above mean: <br />Well: A well is any excavation that is cored, bored, <br />drilled, jetted, dug or otherwise .constructed for the <br />purpose of locating, testing, developing, draining or <br />recharging any ground water reserves or aquifer, or that <br />may control, divert; or otherwise control the. movement <br />of water from or into any aquifer. <br />Well Water Su~Iv SSystem: A well water supply system <br />is any well that is intended for use or is usable as a source <br />of water supply for domestic use (including household <br />purposes, farm livestock, or gardens) and the pump and <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.