Browse
Search
Agenda - 10-19-2004-7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 10-19-2004
>
Agenda - 10-19-2004-7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:39:25 PM
Creation date
8/29/2008 10:24:59 AM
Metadata
Fields
Template:
BOCC
Date
10/19/2004
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes - 20041019
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Library Long-Range Faciliry Planning <br />ai <br />^ The design of the facility should take into account the different needs of the various <br />user populations, so that all will feel welcome <br />Appendix D summarizes a discussion with the Vice President of DTCC regarding some of <br />the above issues and specific, requirements the Library would need to fulfill in its role as a <br />community college library. <br />Orange County Heritage Center <br />The 2001 Librazy Task Force recommended the establishment of an Orange County Heritage <br />Center to consolidate and preserve historical materials and to make them readily accessible to <br />researchers.. This recommendation is reaffirmed in this report. <br />If a site is selected for a new Central Library in the downtown area, it is recommended that <br />the Heritage Center be housed in that library. If not, previous discussions identified the <br />location of Hassell and Tryon Streets as a preferred location. A building constructed there <br />and designed to reflect the historic character of the community would contribute to the appeal <br />of the downtown area. Another option is to locate the center in the current library facility, <br />thus reducing construction costs. If this option is chosen, environmental concerns must be <br />addressed and the facility renovated to be conducive to the preservation of archival materials. <br />One concern noted by staff is the amount of light coming into the main reading area, <br />resulting in deterioration of printed materials. <br />The Archival Task Force is in the process of inventorying materials that might be housed in <br />the facility, The types of materials already identified include books, periodicals, various <br />types of primary and secondary historic documents, maps, photographs, and organizational <br />records, Other possible resources include video and audio recordings, including collections <br />of oral history. In addition to housing the resources, the facility will require staff and <br />materials processing space, space for researchers, gathering spaces for symposiums and <br />speakers, display areas, and security including lockers for visitors' bags. <br />A private trust fund in the amount of approximately $120,000 is available to support the <br />North Cazolina Collection of the public library and could be applied to the establislunent of <br />this center. <br />Hillsborou l~ 1 Cybrary or Neighborhood Branch <br />It is also recommended that, if a new central library is constructed outside of the downtown <br />area, the Heritage Center house a small neighborhood branch library to serve residents of <br />downtown Hillsborough. A substantial number of the current users of the Orange County <br />Library live downtown and value being able to walk to the facility. In addition, it would offer <br />service convenience to users of the Heritage Center and the opportunity for shared staff, <br />program room, and equipment, <br />It is estimated that a facility of 8,000 to 10,000 square feet would optimally serve both of <br />these functions (see Appendix E); however, a final determination on size depends on <br />decisions still to be made regarding the materials to be housed in the Heritage Center and the <br />goals for future collection development. A note regarding digitization of materials: it is <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.