Browse
Search
Agenda - 10-19-2004-7c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 10-19-2004
>
Agenda - 10-19-2004-7c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:39:25 PM
Creation date
8/29/2008 10:24:59 AM
Metadata
Fields
Template:
BOCC
Date
10/19/2004
Document Type
Agenda
Agenda Item
7c
Document Relationships
Minutes - 20041019
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange Counry Library Long-Range Facility Planning ' <br />Introduction <br />In .January, 2004, the Orange County Board of Commissioners appointed a Library Services <br />Task Force to review the recommendations aprevious task force had submitted to the County <br />in 2001 and to "subsequently make recommendations to improve library services and <br />facilities specifically related to the expansion of the Central Library in Hillsborough and the <br />branch library in Carrboro." Specific areas of interest were the potential for co-location of a <br />new central facility with the Orange County campus of Durham Technical Community <br />College (DTCC) and combining the operations of Carrboro's McDougle Branch Library and <br />Cybrary into one branch library facility. <br />The Task Force held its first meeting in May, and identified four areas of interest to be <br />investigated: <br />^ Co-located central library with DTCC Orange County Campus <br />^ Carrboro facility <br />^ Need for Orange County archival repository <br />^ Linking of all public libraries in Orange County, including the Chapel Hill Public <br />Library, technologically <br />The Library contracted with Dale Gaddis, Library Consultant, in .Tiny, 2004, to assist with the <br />work of the Task Force, as follows: <br />^ Identify critical issues that need to be addressed regarding library Facilities, needed <br />and desired functions to be housed in the new headquarters facility, and priorities <br />regarding service development throughout the county <br />• Determine the space requirements of a new headquarters library facility which will <br />adequately address community needs and priorities for library services and meet <br />accepted public library standards, using a 15-20 year planning time frame <br />^ Analyze issues raised by the possibility of combining the headquarters library with a <br />community college library, with recommendations regarding a joint use library <br />facility, and identification of potential needs for other library facilities in the county <br />within the same time frame. <br />The Task Force and Consultant reviewed the work of the previous task force. The Consultant <br />gathered and documented for the Task Force more recent planning and statistical information <br />regarding Orange County and the Library. She met with the Library Director to get her <br />perspective on the project and gain arr understanding of administrative and financial issues <br />and structures. She met with Barbara Baker from DTCC and documented the expectations of <br />the college regarding a joint use facility. She facilitated meetings with library staff and the <br />Task Force to identify critical issues that needed to be addressed regarding library facilities <br />and services. <br />It became evident from this initial research that the recommendations requested by the Board <br />of County Commissioners needed to be part of a larger vision for the county as a whole, As a <br />result, the Consultant developed, for Task Force review, facility planning criteria and <br />recommendations which addressed countywide development of library facilities, The Library <br />Director initiated a parallel process during the same time period to investigate the need for an <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.