Browse
Search
2019-024-E Solid Waste - Evans Electric Solid Waste light bulb repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-024-E Solid Waste - Evans Electric Solid Waste light bulb repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:58:14 AM
Creation date
1/22/2019 9:56:21 AM
Metadata
Fields
Template:
Contract
Date
1/24/2019
Contract Starting Date
1/24/2019
Contract Ending Date
2/22/2019
Contract Document Type
Contract
Amount
$1,678.00
Document Relationships
R 2019-024 Solid Waste - Evans Electric lighting repair
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: B65A93BB-6378-42A0-8340-F9CDBA5AA4BB <br /> QUOTE SHEET REVAN <br /> 3511 Evans Corporate Ln E L E C : R I C I N C . <br /> Durham,NC 27705 1W <br /> (919)383-6020 <br /> Fax(919)383-6272 Date: 1/4/18 <br /> Website: www.dwevans.com <br /> To: Orange County Solid Waste From: Josh W. Evans <br /> Attention: Tyler Lunsford E-mail: josh@dwevans.com <br /> Re: Install(5) LED light bulbs in existing <br /> Total Pages (including cover): 1 <br /> light poles <br /> Quote: $1,678.00 <br /> License #: 8163-U <br /> Inclusions: <br /> 1. Provide and install (5)new LED Corn Cob bulbs at designated light poles. <br /> 2. Removal of ballast and re-wire light fixture to accommodate LED. <br /> 3. Scissor Lift will be used for accessing light bulbs on poles. <br /> 4. OSHA trained personnel. <br /> 5. Normal working hours of 7:30am-4:00pm M-F. <br /> Exclusions: <br /> 1. Engineering, drawings and design coordination. <br /> 2. Cleaning beyond the areas of construction. <br /> 3. Traffic or pedestrian control. <br /> Notes: <br /> 1. Our quotation is good for only 30 days. <br /> 2. A contract or purchase order will be needed to start the submittal process. <br /> Thank you very much for the opportunity to quote this project! <br /> Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.