Browse
Search
Agenda - 01-22-2019 7-a-1 - Attachment: OPT SRTP Final Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 01-22-19 Regular Meeting
>
Agenda - 01-22-2019 7-a-1 - Attachment: OPT SRTP Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 1:41:01 PM
Creation date
1/17/2019 1:38:30 PM
Metadata
Fields
Template:
BOCC
Date
1/22/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 01-22-2019 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 01-22-19 Regular Meeting
Agenda - 01-22-2019 7-a - Orange County Public Transportation Short Range Transit Plan
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 01-22-19 Regular Meeting
Minutes 01-22-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> OPT Short Range Transit Plan <br /> <br />Nelson\Nygaard Consulting Associates, Inc. | 5-7 <br /> <br /> <br />Orange-Alamance Connector <br />The Orange-Alamance Connector is a fixed-route service operating along US-70 between Mebane, <br />Efland, and Hillsborough. The existing Orange-Alamance Connector route currently operates <br />every 60 minutes between 10:00 AM and 3:00 PM Monday-Friday and provides westbound <br />service on US-70 and eastbound service on I-40. Additional information about alignment <br />modifications proposed for the existing Orange-Alamance Connector can be found in the change <br />sheets in Appendix B. <br />This route would be improved to provide bi-directional service on US-70 operating every 60 <br />minutes from 6:00 AM to 7:00 PM, Monday through Friday. Expanding the hours of service on <br />this route will help coordinate with recommended changes to GoTriangle Route ODX, which <br />proposes to realign service to use I-85 and I-40 instead of US-70. This route would provide access <br />to Alamance County residents via the Mebane Cone Health Park-and-Ride, provide all-day service <br />to Efland, and would have a total estimated annual cost of $189,000. <br />Figure 5-5 Orange-Alamance Connector <br />
The URL can be used to link to this page
Your browser does not support the video tag.