Browse
Search
Agenda - 01-22-2019 7-a-1 - Attachment: OPT SRTP Final Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2019
>
Agenda - 01-22-19 Regular Meeting
>
Agenda - 01-22-2019 7-a-1 - Attachment: OPT SRTP Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2019 1:41:01 PM
Creation date
1/17/2019 1:38:30 PM
Metadata
Fields
Template:
BOCC
Date
1/22/2019
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7-a
Document Relationships
Agenda - 01-22-2019 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 01-22-19 Regular Meeting
Agenda - 01-22-2019 7-a - Orange County Public Transportation Short Range Transit Plan
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2019\Agenda - 01-22-19 Regular Meeting
Minutes 01-22-2019 Regular Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> OPT Short Range Transit Plan <br /> <br />Nelson\Nygaard Consulting Associates, Inc. | 5-6 <br /> <br /> <br />Fixed-Route Service <br />Hillsborough Circulator <br />The existing Hillsborough Circulator route, which currently operates hourly from 8:00 AM to <br />5:00 PM Monday-Friday, could have expanded hours and operate every 30 minutes from 7:00 <br />AM to 8:00 PM, Monday through Saturday, if additional funding became available. Additional <br />information about alignment modifications proposed for the existing Hillsborough Circulator can <br />be found in the change sheets in Appendix B. <br />Improvements to the Hillsborough Circulator are highly supported by riders. This route would <br />continue to provide connections to multiple park-and-ride lots, including the Durham Tech Park- <br />and-Ride and the future Hillsborough Park-and-Ride. The improved route would have a total <br />estimated annual cost of $416,000. <br />Figure 5-4 Hillsborough Circulator <br />
The URL can be used to link to this page
Your browser does not support the video tag.