Orange County NC Website
<br />7 <br />The developers of both projects will make some improvements on South Churton <br />Street, and plans should be coordinated to provide the facilities as recommended <br />in the feasibility study for this corridor. <br />F. US 70 Bypass Widening: Widen, from the Orange/Durham County Line to the <br />US 70 - I-85 Connector east of Efland, US 70 Bypass to a four-lane divided <br />section with bike and pedestrian improvements, This project should be phased <br />to address traffic counts and existing congestion. The Draft 2006-2012 STIP <br />does not include this project. <br />[NOTE: Orange County may wish, in the next update, to propose phasing of this <br />request, with each phase proposed as a separate project.] <br />G. NC 86 (North of Hillsborough) Improvements: Widen NC 86, from US 70 Bypass <br />north of Hillsborough to SR 1332, Coleman Loop (Coleman Loop also being the <br />intersection area of the planned connector between NC 86 and NC 57), to four <br />lanes with intersection improvements at US 70 Bypass, The Draft 2006-2012 <br />STIP does not include this project. Orange County requests that this project be <br />identified as a need and included in the 2006-2012 STIP. The crash rate (for the <br />three-year period from January 1, 2001, to December 31, 2003) on the segment <br />of NC 86 from US 70 Bypass. to NC 57 was 1147 crashes per 100-million vehicle <br />miles, compared to an average 217 crashes per 100-million vehicle miles on NC <br />routes in Orange County for the same three-year period. <br />NC 86 is the major north-south route through Orange County. NC 57 converges <br />into US 86 just north of US 70 Bypass, The segment of NC 86 between NC 57 <br />and US 70 is congested, rendering a high accident location at the intersection of <br />US 70 Bypass at NC 86. Development north of Orange County (in Caswell and <br />Person Counties) will exacerbate traffic congestion and accident proliferation, <br />II, Comments on Protect U-3808 Elizabeth Bradv Road Extension: South Of US 70 <br />Business to north of US 70 Bypass at SR 1002 (St. Mary's Road), construct <br />multilanes with new crossing of Eno River, <br />A. The proposed corridor, discussed for many years, would require a crossing of the <br />Eno River and impact natural areas, the river corridor and several historic <br />properties, The Orange County Board of Commissioners stresses that the <br />alignment and cross section for the project must be one that has the least impact <br />on the Eno River, the natural environment and cultural sites. <br />B. The Board would not support the option for an alignment along the ridge south of <br />the Eno River (Poplar Ridge) that creates no new crossing of the river if, of the <br />three alignments being studied, it would have the worst impact on biological and <br />hydrological environments and on cultural sites. <br />