Orange County NC Website
42 <br />ORANGE COUNTY PROJECTS WITHIN <br />THE DURHAM-CHAPEL HILL-CARRBORO <br />METROPOLITAN PLANNING AREA <br />ORANGE COUNTY TRANSPORTATION ORANGE COUNTY PRIORITY LIST <br />PRIORITY LIST STATUS IN <br />THE 2006 - 2012 TRANSPORTATION DRAFT STATE TRANSPORTATION <br />IMPROVEMENT PROGRAM (TIP) ~ IMPROVEMENT PROGRAM (STIP) <br />SR 1006, Orange Grove Road, at Interstate 40: Scheduled for feasibility study. <br />Construct a pedestrian bridge over I-40. <br />U-2805: Homestead Road (SR 1777) Unfunded. <br />Improvements: Improve Homestead Road from <br />SR 1834, High School Road, to NC 86 including <br />bicycle and pedestrian facilities. <br />NC 86, Bicycle Lanes: Construct bicycle lanes (4- Not included. <br />foot paved shoulders) from Chapel Hill (Whitfield <br />Road) to Hillsborough (US 70 Business). <br />Old NC 86 (SR 1009) Bicycle Lanes: Construct <br />bicycle lanes (4-foct paved shoulders) from <br />Carrboro (Eubanks Road) to Hillsborough (I-40; <br />Not included. <br />R-2825, Improvements to South Churton Street_ Unfunded. <br />Develop congestion management, limited access, <br />aesthetic and capacity improvements between US <br />70 Business and Interstate 40. <br />US 70 Bypass Widening: Widen, from the Not included. <br />Orange/Durham Ccunty Line to the US 70 - I-85 <br />Connector east of Efland, US 70 Bypass to a four- <br />lane divided section with bike and pedestrian <br />improvements. <br />NC 86 (North of Hillsborough) Improvements: Nat included. <br />Widen NC 86, from US 70 Bypass north of <br />Hillsborough to SR 1332, Coleman Loop, to four <br />lanes with intersection improvements at US 70 <br />