Orange County NC Website
39 <br /> <br /> <br />H) _~ <br />Location & Descri lion <br />Summar of Changes <br />I-0305 I-85 - • Construction initiation slips from FY10 to <br /> I-40 at Hillsborough to FY 12 <br /> Durham County line; widen Completion ofright-of--way purchasing slips <br /> to six lanes and reconstruct from FY08 to FY12 <br /> interchanges . Cost increase from $43.5 million to $52 <br /> million <br />U-2803 Smith Level Road - • Construction completion slips from FYOS to <br /> Rock Haven R.d. to bridge no. FYI O <br /> 88; widen to multilanes Cost increases from $3..5 million to $S 2 <br /> million <br />U-3100 Hillsborough Rd - Right-of--way purchasing slips from FY10 to <br /> Lorraine St, to Old FY12 <br /> Fayetteville Rd..; widen to 36- Construction continues to be Postyear <br /> foot curb-and-gutter • Cost increase from $S,5 million to $7,2 <br /> million <br />U-0624 South Columbia Street - Construction completion slips from FY07 to <br /> Purefoy Rd, to Manning Dr.; FY09 <br /> include bicycle lanes Cost increases from $3,1 million to $4,4 <br /> million <br /> • Gost increase from $3.1 million to $4.4 <br /> million <br /> • Project is categorized as Regionally <br /> Significank, thus must be operational by 2010 <br /> to avoid Air Quality analysis requirement <br />LJ-3306 Weaver Dairy Road - : Construction completion slips from FY07 to <br /> NC 86 to Erwin R.d.; corridor FY09 <br /> upgrade, part on new location Cost increases from $1 I ,3 million to $13.8 <br /> million <br />U-4008 US 15-501/Erwin Road - • Construction completion slips from FY04 to <br /> Intersection Improvement FY05 <br /> • Cost increases from $3,2 million to $4,3 <br /> million <br />U-3808 Elizabeth Brady Road .Construction initiation slips from FY09 to <br /> Extension - FYl l <br /> South of US 70 Business to Cost increases from $12 million to $16..9 <br /> north of US 70 bypass; million <br /> multilanes with new crossing <br /> of Eno River <br />