Browse
Search
Agenda - 05-17-2005-6c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 05-17-2005
>
Agenda - 05-17-2005-6c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 9:31:11 PM
Creation date
8/29/2008 10:24:40 AM
Metadata
Fields
Template:
BOCC
Date
5/17/2005
Document Type
Agenda
Agenda Item
6c
Document Relationships
Minutes - 20050517
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
RES-2005-042 Providing Comments Regarding Draft 2006 - 2012 State Transportation Improvement Program
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2005
RES-2005-043 Comments Draft 2006-2012 State Transp Imp Prog Division 7 Projects in Orange Co
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 <br /> <br /> <br />H) _~ <br />Location & Descri lion <br />Summar of Changes <br />I-0305 I-85 - • Construction initiation slips from FY10 to <br /> I-40 at Hillsborough to FY 12 <br /> Durham County line; widen Completion ofright-of--way purchasing slips <br /> to six lanes and reconstruct from FY08 to FY12 <br /> interchanges . Cost increase from $43.5 million to $52 <br /> million <br />U-2803 Smith Level Road - • Construction completion slips from FYOS to <br /> Rock Haven R.d. to bridge no. FYI O <br /> 88; widen to multilanes Cost increases from $3..5 million to $S 2 <br /> million <br />U-3100 Hillsborough Rd - Right-of--way purchasing slips from FY10 to <br /> Lorraine St, to Old FY12 <br /> Fayetteville Rd..; widen to 36- Construction continues to be Postyear <br /> foot curb-and-gutter • Cost increase from $S,5 million to $7,2 <br /> million <br />U-0624 South Columbia Street - Construction completion slips from FY07 to <br /> Purefoy Rd, to Manning Dr.; FY09 <br /> include bicycle lanes Cost increases from $3,1 million to $4,4 <br /> million <br /> • Gost increase from $3.1 million to $4.4 <br /> million <br /> • Project is categorized as Regionally <br /> Significank, thus must be operational by 2010 <br /> to avoid Air Quality analysis requirement <br />LJ-3306 Weaver Dairy Road - : Construction completion slips from FY07 to <br /> NC 86 to Erwin R.d.; corridor FY09 <br /> upgrade, part on new location Cost increases from $1 I ,3 million to $13.8 <br /> million <br />U-4008 US 15-501/Erwin Road - • Construction completion slips from FY04 to <br /> Intersection Improvement FY05 <br /> • Cost increases from $3,2 million to $4,3 <br /> million <br />U-3808 Elizabeth Brady Road .Construction initiation slips from FY09 to <br /> Extension - FYl l <br /> South of US 70 Business to Cost increases from $12 million to $16..9 <br /> north of US 70 bypass; million <br /> multilanes with new crossing <br /> of Eno River <br />
The URL can be used to link to this page
Your browser does not support the video tag.