Browse
Search
SWAB minutes 030807
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Solid Waste Advisory Group
>
Minutes
>
2007
>
SWAB minutes 030807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2019 4:28:11 PM
Creation date
1/14/2019 3:59:51 PM
Metadata
Fields
Template:
BOCC
Date
3/8/2007
Meeting Type
Regular Meeting
Document Type
Advisory Bd. Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes - Regular Meeting <br /> Solid Waste Advisory Board <br /> March 8 , 2007 <br /> Approved April 5, 2007 <br /> Wilson replies that they are open on the top because that is how they will be loaded . <br /> They will be loaded and then pulled to a staging area where they will be tarped . The <br /> contract will be ruthless about how they will control litter and tarp their trucks . <br /> 5 . Programs/Services Update <br /> SW Operations Center Wilson states that we are almost finished with the design of the <br /> new administrative offices . There have been some difficulties with the septic system <br /> and water reuse system and getting the health department to sign off on it. We ' ve had <br /> to relocate and redesign and should be ready to go out to bid in three to four weeks . <br /> Highzvay 57 Convenience Center Site Identification Wilson states that the site will close at <br /> 7pm on Apri124th . By the first the fence will be down, everything will be removed <br /> and it will be turned back over to the owner . Simultaneously we have purchased <br /> property adjacent to the Walnut Grove Convenience Center and are going to <br /> temporarily expand that site to handle the traffic that will be diverted from the Hwy <br /> ite will need to be up and ready by the time Hwy 57 57 closure . The new temporary s <br /> closes . Once a new Hwy 57 site is identified we will get off the leased property and <br /> construct a smaller modern convenience center for the Walnut Grove area . It' s not <br /> clear when a new site will be identified . The cost of the temporary expansion is <br /> $190, 0000 <br /> Walnut Grove Convenience Center Temporary Expansion See above . <br /> Mixed Paper to Curbside Collection Programs Pollock states that the bin distribution is <br /> just about complete . The first couple months of data in the urban area show about a <br /> twenty percent increase 'n tonnage . We are dealing with people ' s increase in <br /> shredding paper and including the CD ' s and credit cards . They have ways of getting <br /> it out but it increases the cost. <br /> Other Wilson states that legislation is being introduced now as an outflow of the <br /> landfill moratorium that was passed last year . The State was trying to respond to the <br /> two large landfills that are planning to take waste from the northeast. The proposals <br /> I ' ve seen [for tipping fee surcharges and new double lined landfills] would make our <br /> tip fee go from $46 / ton to the $ 70 / ton. DENR has not been willing to discuss the <br /> details of these bills . If you' re requiring double liners, that doegn t necessarily mean <br /> the single liners are failing, but it definitely makes waste disposal more expensive . <br /> 6 . Other Sassaman states that we need to come back to the solid waste management plan <br /> process . How do we get this moving? <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.