Browse
Search
CFE 090803
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2003
>
CFE 090803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 4:22:48 PM
Creation date
1/7/2019 4:17:43 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ens Page 4 of 11 <br /> Preliminary issues the agency says could be <br /> associated with the plans include potential effects <br /> of the activities on lynx and its habitat , the <br /> candystick plant, soil productivity, on threatened, <br /> endangered, and sensitive fish, fish habitat and <br /> water quality, reduction in access to the area, and <br /> consistency with the anticipated Total Maximum <br /> Daily Load of the South Fork Clearwater River . <br /> The Total Maximum Daily Load is a federal <br /> government standard that defines the maximum <br /> amount of a pollutant that a body of water can <br /> receive and still meet water quality standards . <br /> The agency hopes the Environmental Impact <br /> Statement (EIS ) will help answer these questions : <br /> . Are fuel hazard reduction activities needed, <br /> and if so , where, when and how would they <br /> be implemented? <br /> • What transportation system is necessary in <br /> the analysis area and how will it be <br /> managed ? <br /> • Are the fish habitat and water quality <br /> improvement activities needed? <br /> • What mitigation is needed to assure forest <br /> management activities are consistent with <br /> the Nez Perce Forest Plan and <br /> environmental law ? <br /> • Are amendments to the plan needed to <br /> implement the proposed actions ? <br /> . What monitoring is needed? <br /> A draft EIS is expected in January 2004 and a final <br /> version in April 2004 . Should an action alternative <br /> be selected, implementation could be initiated in <br /> fall or winter of 2004 . <br /> EPA Promotes Environmental <br /> Management Systems <br /> WASHINGTON, DC , June 13 , 2003 (ENS ) - To <br /> encourage the widespread use of Environmental <br /> Management Systems for businesses , the U . S . <br /> Environmental Protection Agency (EPA) <br /> announced a new guidance to promote their use in <br /> compliance assurance and enforcement programs . <br /> httn : //ens -news . com/ ens/lun2003 /2003 - 06 - 13 - 09 . asp 06/ 16/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.