similar . The quarry was built in 1932 at a much smaller size than it should have <br /> been , so it is not sufficient . For example , there is 30 square miles of water <br /> pouring into the reservoir and the capacity is too small to hold it so a lot of water <br /> is lost . Cane Creek reservoir was built to a size , which was compatible to the 30 <br /> square miles . The quarry reservoir should have been built to that size also . <br /> Extensive studies have been done on increasing the size of the reservoirs . The <br /> storage necessary could be easily reached by expanding the quarry reservoir . <br /> The yield of each reservoir — one being 3 - 1 / 2 million and the other 10 million <br /> gallons per day was noted . With the additional reservoir there could be 20 <br /> million gallons per day yield using the same watershed area . <br /> The blast effects were reported as being similar to daily California tremors that <br /> move pictures on walls . Other concerns discussed were effects on wells , water <br /> supply issues , and stone needs , Jordan Lake — increase size unlikely because it <br /> has drains of heavily industrialized areas with problems , and other safety issues <br /> of drinking water . Two requirements of the quarry company and OWASA could <br /> be to provide piped water supply to people in the watershed if their wells are <br /> adversely effected , secondly they should be recompensed for any damages that <br /> occur . An example was given that when gravel is lost on the roadways by trucks <br /> hauling rock this causes damage to others using roadways . A possible solution <br /> might be that as a truck leaves a construction site it could be washed including <br /> the wheels to remove stones and also the loads should be covered thereby <br /> alleviating further damages by flying rock . The costs of these types of <br /> compensations will be small compared to the value of the water supply . <br /> Other concerns discussed were the water issues surrounding growth and <br /> development, using water to discourage growth , being at the headwaters of all <br /> the streams the water will be valuable whether for OWASA service area now or <br /> future , growth will occur and the water will be an valuable resource . The excess <br /> water we now have flows downstream and could be used in the future . <br /> The CfE concluded to reserve making a statement until further investigation and <br /> detail studying of this issue is completed . Tucker volunteered to attend the <br /> meeting in a citizen capacity and report back at a later time . Another idea was <br /> to assign investigation of this issue to the future water committee if the CfE <br /> determines to take on this study . <br /> VI . CfE Goals for FY 2000 - 01 <br /> The CfE adopted to goals as distributed with the following changes . <br /> Reword the fourth goal under the Air Quality Committee to say , " Investigate <br /> potential for state to establish additional air quality monitoring stations in Orange <br /> County . " And change the completion date to " June 2001 . " <br /> DRAFT CFE 4/ 10/00 Minutes Page 4 of 6 <br />