Browse
Search
CFE 050800
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2000
>
CFE 050800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 3:30:29 PM
Creation date
1/7/2019 3:21:20 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chatham County the setback for confinement buildings and lagoons is 2 , 500 to <br /> 5 , 500 feet from residences . <br /> Fortmann reported on actions resulting from the first meeting : 1 ) the Planning <br /> Department will determine how many locations in the county are suitable for <br /> large livestock operation based on state siting criteria ; and 2 ) Cooperative <br /> Extension will prepare a summary of all the state and county requirements in <br /> terms of permitting and inspections . <br /> The resolution establishing the study committee called for . a final report to the <br /> , BOCC by June 1 , 2000 . Fortmann noted , however, that farming representatives <br /> have asked to extend that timetable since the study is being done during the <br /> busy season . They asked that the next meeting be in October . Fortmann said <br /> he would keep the CfE informed of further developments . <br /> IV. Approval of March 13 , 2000 Minutes . <br /> MOTION : Kohorn made motion to approve the March 13 , 2000 minutes . <br /> Seconded by Pratt . <br /> VOTE : Unanimous , <br /> V . Quarry Expansion Discussion <br /> Tucker reported that a member of a concerned citizens group had contacted her <br /> and requested that the CfE be made aware of the proposed quarry expansion at <br /> Bethel - Hickory Grove Church Road . She asked if members would consider <br /> making a statement prior to an upcoming public meeting (April 12 , 2000 ) . <br /> Tucker explained that the American Stone Company is in negotiations with <br /> OWASA to expand the current quarry operations in Orange County . The quarry <br /> is reaching capacity and the company is looking to expand the quarry onto <br /> adjacent land owned by OWASA . Upon depletion of the original quarry it <br /> became a reservoir, and the same is proposed for the new quarry . Tucker said it <br /> would be good to investigate what analyses have been done to determine the <br /> best alternative for the meeting water needs for the area . Other topics <br /> discussed included the size of the pits , relocating Bethel - Hickory Grove Church <br /> Road , and preserving wetland areas . <br /> Shaw showed a map of the proposed project expansion . Okun described the <br /> area as lying between University Lake and Cane Creek . He explained that <br /> University Lake was built at a size much too small to hold the water from its 30 - <br /> square - mile drainage area . As a result, much of the water is lost to the system . <br /> He noted that drainage area for the much larger Cane Creek Reservoir is also 30 <br /> square miles . The abandoned quarry site could provide the additional storage <br /> necessary to meet projected needs . <br /> DRAFT CFE 4/ 10/00 Minutes Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.