Browse
Search
CFE 031102
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2002
>
CFE 031102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2019 2:53:05 PM
Creation date
1/7/2019 2:43:34 PM
Metadata
Fields
Template:
BOCC
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Parkland Acquisition Evaluation Template Attachment 2 <br /> Assessment of OWASA Mitigation Tract <br /> using Adopted Criteria for <br /> Evaluating Potential Parkland Acquisition <br /> Parklands Acquisition Criteria OWASA Mitigation Tract <br /> The existence of matching funds from a N / A — Site located in unincorporated part <br /> requesting jurisdiction of the county , Possible donation / lease . <br /> Potential for grants and other funding N / A — Land may be available at little or <br /> opportunities no cost to Orange County . <br /> [ Funds for trail development may be <br /> available from NC Rec , Trails Pro ram . <br /> Completion of existing projects with an N / A <br /> adopted facility Ian <br /> Contains a site identified in the NO - It does , however , include 150 - 180 <br /> Inventory of Natural Areas and Wildlife acres of mature hardwoods identified as <br /> Habitats of Orange County , N . C . prime forest wildlife habitat in the 1999 <br /> 0 <br /> inventory conducted for Orange County . <br /> Compatibility of planned park use with YES — Potential park uses include low . <br /> adjacent land uses impact recreation ( hiking / nature trails ) <br /> and seasonal hunting . Hunting would be <br /> compatible as long as there were clear <br /> and appropriate rules established and <br /> enforced so as not to adversely impact <br /> the surrounding land uses . ( e . g . , a <br /> . . separation of uses during hunting season <br /> Appropriate intensity of use for the area YES — A public park featuring low - impact <br /> recreation would blend into with this <br /> sparsely populated area of the County . <br /> Cane Creek watershed protection area <br /> Location YES — The site would help satisfy park <br /> needs identified in Parks Element of the <br /> Comprehensive Plan by establishing the <br /> " Bingham - Cane Creek District Park . " <br /> Promotes continuity of wildlife corridors , YES — Could provide an alternate link to <br /> rustic trails and linear parks proposed Cane Creek to Seven Mile <br /> Creek/ Eno River rustic woodland trail and <br /> wildlife corridor . <br /> Land is adjacent to new schools NO — Closest schools are 4 . 5 miles away . <br /> ( Efland - Cheeks Elementary ; Cedar Ridge <br /> Hi h Grady Brown Elements <br /> Land for active recreation is suitable and MAYBE — Site includes areas that may be <br /> appropriate for planned uses suitable for active recreation , but would <br /> require clearing and access may be <br /> difficult . OWASA prefers not to allow <br /> active recreation at this site . The <br /> reservoir permit may ose limitations . <br /> Furthers purposes of Upper Eno and NO — Site is located outside of those <br /> New Hope Corridor preservation efforts riparian corridors . <br />
The URL can be used to link to this page
Your browser does not support the video tag.