Browse
Search
2019-003-E AMS - WxProofing change request 1 for Link building
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-003-E AMS - WxProofing change request 1 for Link building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:42 AM
Creation date
1/4/2019 3:49:02 PM
Metadata
Fields
Template:
Contract
Date
12/21/2018
Contract Starting Date
8/1/2018
Contract Document Type
Agreement - Construction
Amount
$25,996.00
Document Relationships
R 2019-003 AMS - WxProofing change request 1 for Link building
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:561791F5-6FFD-46E3-AOFD-87C8199343E4 <br /> Comprehensive Diagnostics. <br /> WXF <br /> Practical Solutions. <br /> September 11, 2018 RFC #: 03 <br /> Mr. Jeffery E. Thompson (jethompsonkoran eg countync. og_v) <br /> Orange County <br /> Director—Asset Management Services <br /> 133 W. Margaret Lane <br /> Hillsborough,NC 27278 <br /> Reference: Link Government Center—Changes to Scope—Proposal- Credits <br /> Dear Mr. Thompson, <br /> We propose to furnish all necessary labor, materials, equipment, and insurance to complete <br /> the work as outlined below. <br /> WxProofing LLC <br /> 309 Gallimore Dairy Road <br /> Suite 104 • Shoring Changes from Original Design.........................................................................<1,125.00> <br /> Greensboro,NC 27409 o Credit for labor savings. <br /> PO Box 8030 <br /> Greensboro,NC27419 . Grading Changes..........................................................................................................<$3,290.00> <br /> (336)664-8038 o See attached proposal from SUNROCK Carolina Division. <br /> o Credit for labor and less excavation needed. <br /> www.WxProofing.com o Sunrock Original $13,701.25, New$10,840.75 = <2,860.50> plus 15% =<$3,290.00> <br /> TOTAL PROPOSAL.......................................................................<$4,415.00> <br /> We have based our pricing on performance of said work during normal business hours and <br /> the owner furnishing suitable utility services required for the restoration process. i.e. water <br /> and electricity. Please be advised that all work shall utilize materials and methods in <br /> accordance with industry standards. <br /> We hope this information meets with your satisfaction and can proceed with signing of an <br /> agreement. We look forward to the possibility in working with you on this project. <br /> In the meantime,please feel free to contact me if you have any questions concerning the <br /> contents of this correspondence or if I can be of further assistance. <br /> Very truly yours, <br /> 9�fx�L4 <br /> Robert McDowell <br /> Senior Project Manager <br /> WxProofing LLC <br /> rmcdowellgwxproofing com <br /> Cell: 336-209-7202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.