Browse
Search
2019-003-E AMS - WxProofing change request 1 for Link building
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-003-E AMS - WxProofing change request 1 for Link building
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:42 AM
Creation date
1/4/2019 3:49:02 PM
Metadata
Fields
Template:
Contract
Date
12/21/2018
Contract Starting Date
8/1/2018
Contract Document Type
Agreement - Construction
Amount
$25,996.00
Document Relationships
R 2019-003 AMS - WxProofing change request 1 for Link building
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:561791 F5-6FFD-46E3-AOFD-87C8199343E4 <br /> Carolina Smock(Contracting Division) <br /> SUNROCK P.O.Box 509 <br /> Butner, NC 27M <br /> Phone: (919)57,64M <br /> Fax: (919)5754401 <br /> To: Summit Design&Engineering Contact: Kevin O'Dell <br /> Address: Hillsbourgh, NC US Phone: 919-732-3883 <br /> Fax: <br /> Project Name: Link Building Backfill (Rev 8-24-18) Bid Number: <br /> Project Location: South Cameron Street, Hillsborough, NC Bid Date: 8/24/2018 <br /> Item # Item Description Estimated Quantity Unit <br /> Mobilization & General Conditions <br /> 1 Mobilization&General Conditions 1.00 LS <br /> Total Price for above Mobilization&General Conditions Items: $5,070.00 <br /> Grading <br /> 2 Backfill Foundation Wall With #57 Stone Up To 2' Below Finished Grade 400.00 TON <br /> 3 Backfill Final 2'Of Fill With Stockpiled Dirt Onsite 90.00 CY <br /> 4 Fine Grade Area To Drain Away From The Building 115.00 LF <br /> 5 Seed And Straw Disturbed Area 0.10 ACRE <br /> Total Price for above Grading Items: $25,046.25 <br /> Benching Slope <br /> 6 Excavate Slope(1 To 1)And Stockpile Onsite 485.00 CY <br /> 7 Additional Backfill Of Excavated Slope 485.00 CY <br /> Total Price for above Benching Slope Items: $13,701.25 <br /> Additional Mobilizations <br /> 8 Additional Mobilization To Backfill Shoring For Safety Access(8/15) 1.00 EACH <br /> 9 Additional Mobilization To Safe Up Slope(8/29) 1.00 EACH <br /> Total Price for above Additional Mobilizations Items: $2,470.00 <br /> Total Bid Price: $46,287.50 <br /> Notes: <br /> • The Above Prices Assume that all Onsite Material is Suitable Structural Fill and is Located Next to the Hole. Importing Additional Fill will be an <br /> Additional Cost. <br /> • The Above Price Does Not Include Hauling Off Any Excess Material <br /> • Restoring Landscaping and Mulch by Others <br /> • This Proposal Does Not Include Rock Excavation or Removal. If Rock Needs to be Excavated or Removed it Will be an Additional Cost. <br /> • This Proposal is Based on Stockpiling Excavated Material Close to the Trench. If Material Needs to be Hauled Out and Back in it will be an <br /> Additional Cost. <br /> • This Proposal Does Not Included and Shoring or Slope Stabilization <br /> • Sunrock is Not Responsible for Any Damage or Injuries Due to Trench or Shoring System Failure <br /> 8/24/2018 3:59:37 PM Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.