Orange County NC Website
DocuSign Envelope ID: E45930OD-0094-4E66-A944-039543AOE351 <br /> 8.2 Surveys and Testing <br /> 8.2.1 The Owner shall furnish the Designer with a certified land survey of the site,giving, as applicable,grades and lines of streets, <br /> alleys,pavements and adjoining property; rights-of-way, restrictions, easements,encroachments, zoning, deed restrictions, boundaries <br /> and contours of the site; locations, dimensions and complete data pertaining to existing buildings,other improvements and trees, and <br /> other pertinent information reasonably requested by the Designer including that concerning available service and utility lines, both <br /> public and private, above and below grade, including inverts. <br /> 8.2.2 The Owner shall provide the services of a geotechnical engineer or other consultant,or compensate for such sub-consultant <br /> services provided by the Designer,when such services are reasonably deemed necessary by the Designer,and agreed and consented to <br /> in writing by Owner, as shown ❑n the Designer's schedule described in Article 6.1.2,to provide reports,test borings,test pits, soil <br /> bearing values, percolation tests, air and water pollution tests,ground corrosion and resistivity tests and other necessary operations for <br /> determining subsoil,air and water conditions,all together with reports and appropriate professional recommendations thereof to <br /> ensure construction materials and geotechnical requirements of the construction contract are met. <br /> 8.2.3 All services, data, information, surveys and reports required of the Owner pursuant to this Article 8,shall be furnished at the <br /> Owner's expense and, absent any negligence or failure to follow professional standards on the part of Designer,the Designer shall be <br /> entitled to rely upon the accuracy and completeness of such services, data, information,surveys and reports. <br /> 8.3 Permits and Approvals <br /> 8.3.1 The Owner shall secure and pay for all necessary permits, licenses, approvals, easements, assessments,and charges required for <br /> the construction, use or occupancy of permanent structures or for permanent changes in existing facilities.The Designer shall provide <br /> the Owner with a schedule of all required approvals and of the dates by which application for such approvals must be made in order to <br /> avoid any risk of delay to the Project, prepare necessary application farms, present documents requiring approval by the Owner and <br /> submit documents with the Owner's approval to the appropriate approval agency. <br /> ARTICLE 9 <br /> INSURANCE <br /> 9.1 General Requirements <br /> 9.1.1 The Designer shall purchase and maintain and shall cause each of its Consultants to purchase and maintain during the period of <br /> performance of this Agreement,and for five(5)years after the later of final completion of the Project or issuance of a Certificate of <br /> Occupancy of the Project, insurance for protection from claims under workers'or workmen's compensation acts;Comprehensive <br /> General Liability Insurance(including broad form contractual liability and complete operations,explosions,collapse,and underground <br /> hazards coverage)covering claims arising out of or relating to bodily injury, including bodily injury,sickness,disease or death of any of <br /> the Designer's or Consultants'employees or any other person and to real and personal property including loss of use resulting thereof; <br /> Comprehensive Automobile Liability Insurance, including hired and non-owned vehicles, if any,covering personal injury or death,and <br /> property damage;and Professional Liability Insurance,covering personal injury, bodily injury and property damage and claims arising out <br /> of or related to the performance under this Agreement by the Designer or its agents, Consultants and employees. <br /> 9 <br /> Revised 10/17 <br />