Browse
Search
2019-001-E DEAPR - Blackwood Farm Park design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-001-E DEAPR - Blackwood Farm Park design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:20 AM
Creation date
1/4/2019 3:48:44 PM
Metadata
Fields
Template:
Contract
Date
12/3/2018
Contract Starting Date
12/3/2018
Contract Document Type
Agreement - Services
Agenda Item
12/3/18
Amount
$244,760.00
Document Relationships
R 2019-001 DEAPR - Blackwood Farm Park design
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E459300D-0094-4E66-A944-039543AOE351 <br /> Designer shall give prompt written notice to the Owner. Provided that such notice has been given,the Designer may request in writing <br /> an adjustment in the Key Milestone Listing dates,which shall be granted by the Owner to the extent reasonable. <br /> ARTICLE 7 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this <br /> Agreement. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> Not-to-exceed Compensation for Basic Services consists of the following compensation for the following separate categories of services: <br /> 7.2.1 Schematic Design Phase. Lump Sum (Insert Lump Sum or Time and Materials as appropriate)fee of$70,495. <br /> 7.2.2 Design Development Phase. Lump Sum fee of$42,609. <br /> 7.2.3 Construction Document Phase. Lump sum fee of$58,059. <br /> 7.2.4 Bidding and Contract Award. Lump sum fee of$9,976. <br /> 7.2.5 Construction Phase. Lump sum fee of$53,056. <br /> 7.2.6 Post Construction Phase. Lump sum fee of$10,565. <br /> 7.2.7 Additional Basic Services(Select all that apply): <br /> Intentionally Omitted <br /> 7.3 Payment for Basic Services Rendered as described in Attachment B <br /> 7.3.1 Payment to the Designer for Basic Services shall become due and payable as progress deliverables and categories of services are <br /> completed. Upon completion of each category, payment will be made by the Owner within 30 calendar days of receipt of an invoice <br /> which is in form and substance acceptable to the Owner. When applicable such invoice shall include supporting documentation, as <br /> designated by Owner,for any reimbursable expenses claimed by Designer. In the event the Owner finds any part or parts of all or any <br /> portion of an invoice presented by the Designer not to be acceptable,it shall identify to the Designer the part or parts which are not <br /> acceptable and shall pay the part or parts of the invoice which are acceptable, if any. This paragraph is not intended to indicate Owner <br /> satisfaction of any work or services. No deductions shall be made from the Designer's fees for basic services except in accordance with <br /> this Agreement or to reimburse the Owner for costs or expenses incurred or anticipated to be incurred for which the Designer is liable. <br /> 7.3.2 If the Owner increases or decreases the scope of the Project by Yen percent(10%)or more of the currently estimated Total <br /> Project Cost,the compensation for Basic Services shall be equitably adjusted. <br /> 7.4 Compensation for Hourly Not-to-Exceed and Additional Services <br /> 7 <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.