Browse
Search
2019-001-E DEAPR - Blackwood Farm Park design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-001-E DEAPR - Blackwood Farm Park design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:20 AM
Creation date
1/4/2019 3:48:44 PM
Metadata
Fields
Template:
Contract
Date
12/3/2018
Contract Starting Date
12/3/2018
Contract Document Type
Agreement - Services
Agenda Item
12/3/18
Amount
$244,760.00
Document Relationships
R 2019-001 DEAPR - Blackwood Farm Park design
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E45930OD-0094-4E66-A944-039543AOE351 <br /> 5A.5 Designer or its Consultants shall provide all such services as are made necessary by the negligence or default of a Consultant or <br /> subconsultant. Such services shall be provided at no additional cost to Owner. <br /> 5.1.6 Designer or its Consultants shall provide additional or extended services during the Construction Phase made necessary by(a) <br /> defective work of Consultants)or contractors); (b) prolongation of construction past the scheduled completion date, provided the <br /> prolongation is not due to the fault or negligence of the Designer, its employees,Consultants or agents; or(c)default under the <br /> construction contract due to delinquency or insolvency. <br /> 5.1.7 Designer or its Consultants shall Provide additional services and costs necessitated by special out-of-town travel required by the <br /> Designer and approved in advance in writing by the Owner,other than visits to the Project and other than travel reasonably required to <br /> fully accomplish the Basic Services. <br /> 5.1.8 Designer,and its Consultants if necessary, shall attend special public hearings for the Project,other than those listed herein, <br /> which are called by the Board of County Commissioners. <br /> ARTICLE 6 <br /> DURATION OF DESIGNER'S SERVICES <br /> 6.1 Scheduling of Services <br /> 6.1.1 Attachment D to this Agreement is the Key Milestone Listing which defines the sequence and timing of the design and <br /> construction activities.The Designer and its Consultants shall schedule and perform their activities so as to meet the Milestone ❑ates <br /> shown. No deviation by the Designer or his Consultants from the Key Milestone Listing shall be allowed without prior written approval <br /> by the Owner. <br /> 6A.2 The Designer's schedule for the performance of its activities and the activities of its Consultants shall be in accordance with the <br /> outline in Attachment D.The Designer shall also prepare and submit to the Owner for review and approval a schedule of all known items <br /> of information,approvals or decisions to be furnished or made by the Owner, including the dates by which the Owner shall have all <br /> information necessary from the Designer with respect to that item, approval or decision and the date by which the item of information, <br /> approval or decision should be communicated to the Designer.The Owner shall always have a reasonable time within which to provide <br /> such item of information,approval or decision and shall not have any responsibility for any delay occurring by reason of the Owner's <br /> being unable,through no fault of the Owner,to supply such item of information,approval or decision. <br /> 6.1.3 Should the Owner determine that the Designer is behind schedule, it may require the Designer to expedite and accelerate its <br /> efforts, including providing additional manpower and/or overtime,as necessary,to perform its services in accordance with the Key <br /> Milestone Listing at no additional cost to the Owner. <br /> 6.1.4 The commencement date for the Designer's Basic Services shall be the date of delivery to the Designer from the Owner of a fully <br /> executed original of this Agreement. <br /> 6.2 Adjustments to the Schedule <br /> 6.2.1 If the Designer's worm on the Project is or will be delayed for more than sixty(60)days through no fault of the Designer,or if the <br /> Owner increases or decreases the scope or size of the Project by ten percent(10%)of currently estimated Total Project Cost,the <br /> 6 <br /> Revised 10117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.