Orange County NC Website
DocuSign Envelope ID: E45930OD-0094-4E66-A944-039543AOE351 <br /> 4.1.1 The Designer shall perform as Basic Services the work and services described herein and in Attachment B to this Agreement. <br /> 4.1.2 The Basic Services will be performed by the Designer in the phases described in Attachment B. <br /> 4.1.3 The Owner shall have the right and option to require the Designer to prepare two separate bid packages with no additional <br /> compensation due the Designer.Such bid packages must be approved by owner prior to submission and,at the Owner's option, may <br /> include but not be Ilmited to: <br /> A. Demolition and preliminary site work; <br /> B. General work, plumbing, mechanical, electrical,fire protection; <br /> C. Landscaping and irrigation; <br /> D. Signage; <br /> E. Furniture. <br /> F.Water and sewer infrastructure <br /> G. Park Office <br /> 4.2 Project Cost Estimates <br /> 4.2.1 At the times designated herein,the Designer shall develop an estimate of the total cost of the Project (the "Total Project Cost"), <br /> including Designer's fees, costs of the construction, costs of equipment,furnishings,furniture and signage, permit fees and appropriate <br /> contingencies, and exclusions, where applicable.These costs sha€I be prepared and submitted to the Owner substantially in the format <br /> shown in Attachment C to this Agreement,with supporting documents listing quantities, unit price, labor rates, man-hour estimates, <br /> overhead and profit, Total Project Cost shall be mutually agreed upon by Owner and Designer as noted in paragraph 4.2.4. The timing <br /> of this Total Project Cost agreement shall be identified as a milestone in Attachment D. If cost estimating is not part of the project <br /> scope,the Total Project Cost shall be specified here: [BLANK] <br /> 4.2.2 Project cost estimates shall be prepared by qualified staff members of the Designer and/or the authorized Project Consultants <br /> listed on Attachment E,or a qualified cost estimating Consultant to the Designer who are acceptable to the Owner. <br /> 4.2.3 Total Project Cost estimates shall be prepared at 3 points in the production of the Designer's work: <br /> A.At completion of schematic design; and <br /> B.At completion of design development; and <br /> C.At completion of 100%of the construction documents;and <br /> 4.2.4 If applicable per section 4.2.3,when the first of these estimates of Total Project Cost has been approved in writing by the Owner, <br /> it shall be used by the Owner as a basis for appropriating funds specifically for the Project. Once this Total Project Cost has been so <br /> approved by the Owner and the conditions of the project(cost environment,time schedule,etc.) are reasonably similar,the Designer <br /> shall be obligated,without additional compensation,to adjust the design of the Project to assure that it remains within the approved <br /> Total Project Cost, <br /> 4 <br /> Revised 10/17 <br />