Browse
Search
2019-001-E DEAPR - Blackwood Farm Park design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-001-E DEAPR - Blackwood Farm Park design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:20 AM
Creation date
1/4/2019 3:48:44 PM
Metadata
Fields
Template:
Contract
Date
12/3/2018
Contract Starting Date
12/3/2018
Contract Document Type
Agreement - Services
Agenda Item
12/3/18
Amount
$244,760.00
Document Relationships
R 2019-001 DEAPR - Blackwood Farm Park design
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E45930OD-0094-4E66-A944-039543AOE351 <br /> DEFINITIONS <br /> Item on Form Definition <br /> Attach basis and justification for estimate.Include description,quantities,units, <br /> CURRENT ESTIMATED CONSTRUCTION COST special features,similar cost on recent projects,etc. <br /> A. 1.Demolition Includes but may not be limited to lead and/or asbestos testing and removal,building <br /> or interior space demolition in whole or part. <br /> Includes but may not be limited to grading,excavating,poor soils and/or rock <br /> A.2.Site Work removal,utilities relocation,roads,walks,parking,streambank repairs,stormwater <br /> management,retaining wails,rainwater harvesting systems,landscaping, <br /> Attach explanation of any special building,mechanical,or electrical service <br /> 8, 1.Utility Services requirements with appropriate distance to existing buildings,water,gas,electrical or <br /> other utility service. <br /> B.9. Associated Construction Costs Includes but may not be limited to construction fire alarm testing,utility shut downs, <br /> utilities,signage,security,displaced parking,staging,lock cores,keys,permits. <br /> B. 10. Other list other signficant sources of cost not included elsewhere. Additional lines may be <br /> added if needed. <br /> PRECONSTRUCTION Includes but may not be limited to land surveys,Ieadlasbestos surveys, <br /> COSTS environmental assessments,copying,postage,costs of print advertising,and <br /> destructive testing. For CM at Risk,preconstruction costs are consistent with the <br /> requirements of the preconstruction services agreement. <br /> CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br /> omissions,concealed site conditions,utility conflicts,and extended overhead <br /> resulting from weather or other delay. <br /> 20 <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.