Browse
Search
2019-001-E DEAPR - Blackwood Farm Park design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-001-E DEAPR - Blackwood Farm Park design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:20 AM
Creation date
1/4/2019 3:48:44 PM
Metadata
Fields
Template:
Contract
Date
12/3/2018
Contract Starting Date
12/3/2018
Contract Document Type
Agreement - Services
Agenda Item
12/3/18
Amount
$244,760.00
Document Relationships
R 2019-001 DEAPR - Blackwood Farm Park design
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E45930OD-0094-4E66-A944-039543AOE351 <br /> Attachment C - Format of Total Project Cost Estimate <br /> ORANGE COUNTY <br /> Attachment C--Project Cost Estimate <br /> PROJECT <br /> IDENTIFICATION: <br /> PROJECT CITY or LOCATION: <br /> (Definitions/explanations are provided an pg 2 to assist in completion of this <br /> form.) <br /> CURRENT ESTIMATED CONSTRUCTION COSTS CITY UNIT COST PER U141T TOTAL <br /> A, Site Preparation <br /> 1, Demolition $0 <br /> 2, Site Work $0 <br /> B. Construction <br /> 1. Utility Services $0 <br /> 2. Building Construction(new space) $0 <br /> 3. Building Construction(existing) $0 <br /> 4, Plumbing(new space) $0 <br /> 5. HVAC(new space) $0 <br /> 6, Electrical(Includes TV&Radio Studio) $0 <br /> 7, Fire Supression and Alarm Systems $0 <br /> 8, Telephone,Data,Video $0 <br /> 9. Associated Construction Casts $0 <br /> 10. Other: $0 <br /> C. Equipment <br /> 1, Fixed $0 <br /> 2. Moveable $0 <br /> ESTIMATED CONSTRUCTION COSTS $0 <br /> Items below may be calculated by percentage or lump sum. if us{ng lump suns,make entry In$field. <br /> DESIGN FEE % (°k of Estimated Construction Casts) $0 <br /> PRECONSTRUCTION <br /> COSTS % (%of Estimated Construction Costs) $0 <br /> CONTINGENCIES % (%of Estimated Construction Costs) $0 <br /> ESTIMATED COSTS (%of Estimated Construction Costs+Contingencies+Design Fee) $0 <br /> Escalation=percent per month multiplied by number of months <br /> (From Est.Date to mid-point of construction)= months %per month <br /> ESCALATION COST INCREASE (Total of Estimated Costs x Escalation%) $o <br /> ESTIMATED TOTAL PROJECT COSTS (Estimated Costs+Escalation Cost Increase if any) $0 <br /> APPROVED BY: TITLE DATE <br /> 19 <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.