Orange County NC Website
DocuSign Envelope ID: E45930OD-0094-4E66-A944-039543AOE351 <br /> Attachment C - Format of Total Project Cost Estimate <br /> ORANGE COUNTY <br /> Attachment C--Project Cost Estimate <br /> PROJECT <br /> IDENTIFICATION: <br /> PROJECT CITY or LOCATION: <br /> (Definitions/explanations are provided an pg 2 to assist in completion of this <br /> form.) <br /> CURRENT ESTIMATED CONSTRUCTION COSTS CITY UNIT COST PER U141T TOTAL <br /> A, Site Preparation <br /> 1, Demolition $0 <br /> 2, Site Work $0 <br /> B. Construction <br /> 1. Utility Services $0 <br /> 2. Building Construction(new space) $0 <br /> 3. Building Construction(existing) $0 <br /> 4, Plumbing(new space) $0 <br /> 5. HVAC(new space) $0 <br /> 6, Electrical(Includes TV&Radio Studio) $0 <br /> 7, Fire Supression and Alarm Systems $0 <br /> 8, Telephone,Data,Video $0 <br /> 9. Associated Construction Casts $0 <br /> 10. Other: $0 <br /> C. Equipment <br /> 1, Fixed $0 <br /> 2. Moveable $0 <br /> ESTIMATED CONSTRUCTION COSTS $0 <br /> Items below may be calculated by percentage or lump sum. if us{ng lump suns,make entry In$field. <br /> DESIGN FEE % (°k of Estimated Construction Casts) $0 <br /> PRECONSTRUCTION <br /> COSTS % (%of Estimated Construction Costs) $0 <br /> CONTINGENCIES % (%of Estimated Construction Costs) $0 <br /> ESTIMATED COSTS (%of Estimated Construction Costs+Contingencies+Design Fee) $0 <br /> Escalation=percent per month multiplied by number of months <br /> (From Est.Date to mid-point of construction)= months %per month <br /> ESCALATION COST INCREASE (Total of Estimated Costs x Escalation%) $o <br /> ESTIMATED TOTAL PROJECT COSTS (Estimated Costs+Escalation Cost Increase if any) $0 <br /> APPROVED BY: TITLE DATE <br /> 19 <br /> Revised 10/17 <br />