Browse
Search
2019-001-E DEAPR - Blackwood Farm Park design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-001-E DEAPR - Blackwood Farm Park design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:20 AM
Creation date
1/4/2019 3:48:44 PM
Metadata
Fields
Template:
Contract
Date
12/3/2018
Contract Starting Date
12/3/2018
Contract Document Type
Agreement - Services
Agenda Item
12/3/18
Amount
$244,760.00
Document Relationships
R 2019-001 DEAPR - Blackwood Farm Park design
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E459300D-0094-4E66-A944-039543AOE351 <br /> 12.5.1 This Agreement represents the entire and integrated agreement between the Owner and the Designer and supersedes all prior <br /> negotiations, representations or agreements, either written or oral.This Agreement may be amended only by written instrument signed <br /> by both the Owner and the Designer. <br /> 12.6 Severability <br /> 12.6.1 If any provision of this Agreement is held as a matter of law to be unenforceable,the remainder of this Agreement shall be <br /> enforceable without such provision. <br /> 12.7 Ownership of Documents <br /> 12.7.1 All designs, drawings,specifications,design calculations, notes and other works developed in the performance of this contract <br /> shall become the property of the Owner and may be used on any other project without additional compensation to the Designer. <br /> ❑esigner does not warrant the use of the documents by the Owner or by any person or entity for any purpose other than the Project as <br /> set forth in this agreement. <br /> 12.8 E-Verify <br /> 12.8.1 Pursuant to the terms of North Carolina General Statutes no county may enter into a contract unless the Designer and its <br /> subconsultants comply with the requirements of Article 2 of Chapter 64 of the North Carolina General Statutes. Where applicable, <br /> failure to maintain compliance with the requirements of Article 2 of Chapter 64 of the General Statutes constitutes Designer's breach of <br /> this Agreement. By executing this Agreement Designer affirms ❑esigner is In compliance with Article 2 of Chapter 64 of the North <br /> Carolina General Statutes. <br /> 12.9 Electronic Signatures <br /> 12.9.1 This Agreement together with any amendments or modifications may be executed electronically. All electronic signatures <br /> affixed hereto evidence the intent of the Parties to comply with Article 11A and Article 40 of North Carolina General Statute Chapter 66. <br /> 12.10 Iran Divestment and Israel Boycott <br /> 12.10.1 ❑esigner certifies that,as of the date listed below, it is not on the Final ❑ivestment List as created by the State Treasurer <br /> pursuant to N.C.G.S. § 147-86.58 or the final boycott list created by the State Treasurer pursuant to N.C.G.S. §147-86.81 nor shall <br /> Designer utilize in the performance of this Agreement any subcontultant or consultant identified on such lists. <br /> 12.11 List of Attachment and Referenced Documents and Priorit <br /> 12.11.1 The design documents consist of this Agreement and the attached and referenced documents. The attachment and referenced <br /> documents are listed in this Section 12.11.1 and are incorporated herein and made part of this Agreement by reference. In the event of <br /> any inconsistency between or among the terms of this Agreement and any of the incorporated listed documents such inconsistency or <br /> conflict shall be interpreted in the following order of priority: <br /> This Agreement <br /> Attachment A- Description of the Project <br /> Attachment B- Description of Basic Services <br /> 14 <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.