Browse
Search
2019-001-E DEAPR - Blackwood Farm Park design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2019
>
2019-001-E DEAPR - Blackwood Farm Park design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2019 10:51:20 AM
Creation date
1/4/2019 3:48:44 PM
Metadata
Fields
Template:
Contract
Date
12/3/2018
Contract Starting Date
12/3/2018
Contract Document Type
Agreement - Services
Agenda Item
12/3/18
Amount
$244,760.00
Document Relationships
R 2019-001 DEAPR - Blackwood Farm Park design
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E45930OD-0094-4E66-A944-039543AOE351 <br /> unearned compensation for Basic Services,whichever is less, less any costs or expenses incurred or anticipated to be unearned by the <br /> Owner due to errors or omissions of the Designer. <br /> 11.3.2 In the event of termination by reason of a material breach of the Agreement by the Owner, the Designer shall be entitled to the <br /> same compensation as it would have received had the Owner terminated the Agreement for convenience,and the Designer expressly <br /> agrees that said compensation is fair and appropriate as liquidated damages for any and all costs and damages it might incur as a result <br /> of such termination. <br /> 11.3.3 In the event of termination by reason of a material breach of the Agreement by the Designer,the Designer shall be paid that <br /> portion of its fees and expenses that it has earned to the date of termination, less any costs or expenses incurred or anticipated to be <br /> incurred by the Owner due to errors or omissions of the Designer or by reason of the Designer's breach of this Agreement. <br /> 11.3.4 Should this Agreement be terminated as provided under this Article 11 the Owner shall be granted, at no additional cost, <br /> ownership of all documents, drawings, and electronic databases relating to the Project, including the ownership and use of all drawings, <br /> specifications,documents and materials relating to the Project prepared by or in the possession of the Designer.The Designer shall turn <br /> over to the Owner within seven (7)days and in good unaltered condition rep rod ucibles of all original drawings, specifications, <br /> documents, electronic data bases and materials. In the event of such termination, and should the Owner use such drawings for <br /> completion of the Project,the Owner shall indemnify and hold the Designer harmless,to the extent authorized by North Carolina Law, <br /> from and against any cost,expense,damage or claim arising out of the loss of life, personal injury or damage to tangible property <br /> occasioned wholly or in part by any act or omission by the Owner, its contractor(s),agents or employees in connection with Owner's use <br /> of such drawings, plans,specifications, renderings,models and other work provided as part of Basic Services and Additional Services, as <br /> may have been amended.The Designer specifically agrees to incorporate the provisions of this paragraph in all contracts for the services <br /> of Designer's Consultants.The Owner agrees that the Designer may retain one set of drawings for its records. <br /> 11.3.5 Should this Agreement be terminated,the Owner shall, nevertheless, have the right to require the Designer and/or its <br /> Consultants t❑ perform such additional effort as may be necessary to provide professionally certified and sealed drawings and to deliver <br /> to the Owner such certified and sealed drawings with respect to any phase or item of the project,for which effort the ❑esigner shall be <br /> compensated in accordance with this Agreement. <br /> 11.4 Suspension <br /> 11.4.1 The Owner may, in writing,order the Designer to suspend,delay or interrupt all or any part of its Services on the Project for the <br /> convenience of Owner. <br /> 11.4.2 In the event the Designer believes that any suspension,delay or interruption of any or a I I of the Work on the Project, may <br /> require an extension of the duration of Basic Services or an increase in the level of staffing by Designer, it shall so notify the Owner and <br /> propose an amendment of the Key Milestone Listing for consideration of the Owner. Such amendment or extension shall be effective <br /> only upon the written approval of the Owner,which will not be withheld unreasonably. <br /> 11.4.3 A suspension,delay or interruption of the Project shall not terminate this Agreement; provided,however,that if such <br /> suspension,delay or interruption causes a suspension of the Designer's services for a period exceeding ninety(90)days,the Designer's <br /> compensation for Basic Services may be equitably adjusted upon mutual agreement of the parties. <br /> 11.S Waiver <br /> 12 <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.