Browse
Search
Agenda - 11-09-2006-1 Space Needs report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-09-2006
>
Agenda - 11-09-2006-1 Space Needs report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2018 2:44:21 PM
Creation date
12/31/2018 2:28:48 PM
Metadata
Fields
Template:
BOCC
Date
11/9/2006
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Space Needs Report ~ 2005 Update <br /> Page 67 of 69 <br /> In summary : <br /> Building Name Proposed Location Priority Rating Est Only <br /> Land - Services Building new campus Tier 1 A $ 11 . 2 Mil . <br /> Animal Services Building new location Tier 1 A $5 Million <br /> Solid Waste Eubanks Road Tier 1 A $1 Million <br /> U fit of Valley Fore Building Valley Fore Road Tier 1A TBD* <br /> U fit of Buildino to potentialIX be acquired TBA Tier 1A TBD* <br /> U fit of vacated space in Planning/A Planning/Ag existing Tier 1 B TBD* <br /> U fit of vacated space at GSC existingTier 1 B TBD* <br /> Libra new campus Tier 16 $11 Million <br /> Plannin and A BuildingRenovations existingTier 1 B TBD* <br /> Parks/Open Space BuildingBlackwood Farm Tier 2A TBD* <br /> Southem Human Services Center existing Tier 2A $3.2 Million <br /> Southern Human Servicesw - Dental Clinic SHSC Tier 2A $ 1 . 8 Million <br /> 9= 1 = 1 Center new campus Tier 2B $3.2 Million <br /> Public Works/OPT existing Tier 2B $9899000 <br /> Motor Pool expansion existing Tier 2B $750, 000 <br /> Whiffed Human Services Center existing/new campus Tier 3A $ 1 . 9 Million <br /> Administration Buildinu new campus Tier 3B $7.2 Million <br /> Legend . <br /> Tier 1 A-construction begins 2005 to mid 2008 <br /> Tier 1 B-construction begins mid 2008 to 2010 <br /> Tier 2A construction begins 2011 to mid 2013 <br /> Tier 213-construction begins mid 2013=2015 <br /> Tier 3A=construction begins 2016 to mid=2018 <br /> Tier 3B= construction begins mid 2018=2020 <br /> 67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.