Browse
Search
Agenda - 11-09-2006-1 Space Needs report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 11-09-2006
>
Agenda - 11-09-2006-1 Space Needs report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2018 2:44:21 PM
Creation date
12/31/2018 2:28:48 PM
Metadata
Fields
Template:
BOCC
Date
11/9/2006
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Space Needs Report � 2005 Update <br /> Page 62 of 69 <br /> Southern Human Services Center Master Plan <br /> In 1992 County Commissioners purchased 34 . 1 acres on Homestead Road , Chapel Hill <br /> with the intent of developing a campus for County services in Southern Orange County . <br /> The site currently hosts the Southern Human Services Center and by m1d -2006 will be <br /> the location of the new Southern Orange Senior Center . <br /> A master plan was prepared shortly after the completion of the human services building <br /> to determine the number of potential building locations on the site . During the siting of <br /> the Senior Center in 2004 , Commissioners reviewed the [faster Plan and determined <br /> that there were important natural areas on the site that should be preserved . The <br /> resulting revised plan ( see attachment # 1 ) eliminates the tw6 building sites in the <br /> southwestern quadrant of the site . It is notable that full development in the southwest <br /> quadrant would not have been desirable until such time the Weaver Dairy extension <br /> was constructed along the western boundary of the County property . The roadway was <br /> in planning when the original master plan was developed . However , since that time the <br /> University ' s project that would have included the roadway has met with a number of <br /> obstacles that has slowed the project' s progress . It is not clear at this time when or if <br /> the second access would become available . <br /> The site designated as "future binding" on the attached master plan has been <br /> discussed as the potential location for f(Aur-e court facilities that may be needed to serve <br /> southern Orange County . <br /> Expansion of the human services building and the site of Dental Clinic construction are <br /> also noted , <br /> 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.