Orange County NC Website
Orange County Space Needs Report � 2005 Update <br /> Page 24 of 69 <br /> Department Name : Arts Commission <br /> Project Development Phase : Interim : Tier 1 B ; Long -term : 2A <br /> Current Location : Court Street Annex <br /> Current Departmental Square Footage : 180 <br /> Current # Employees : 1 <br /> Proposed Square Footage : 569 <br /> Options to accommodate space needs : <br /> • Interim : The 2000 space plan indicated that the Arts Commission could <br /> locate to the Graham Building , which currently houses the Veteran ' s office (who <br /> would relocate to more easily handicapped accessible space at the Whiffed <br /> Building ) , a JOCCA office and the Literacy Council office. While that option still <br /> exists , since the last study the Commission has expressed a desire to include <br /> considerable studio space . The size of the Graham Building cannot <br /> accommodate the full amount of studio space requested ( approx . 1000 s . f . ) <br /> Note . This historical building is one of two County facilities that do not meet <br /> handicapped accessibility requirements . (Old Hillsborough Savings Bank, next <br /> door to this location is the other. ) Alternative service locations to meet the <br /> needs of handicapped clients have been designated for the current services <br /> operating from this location . <br /> • Long - term : Co - locating this ' function with Parks/Open Space departments <br /> may be an option , particularly if the facilities for those departments are <br /> developed at the Blackwood Farm , which would provide an " arts -friendly" <br /> environment for the Arts Commission . Since it is also located midway between <br /> the two population centers of the county , both artist communities may be well <br /> served . Explore the feasibility of using one of the outbuildings at the farm site <br /> for this purpose . Since the Blackwood Farm lies in the Rural Buffer and as such <br /> is not served by public sewer , a paint reclamation system for the studio <br /> operations should be considered to avoid complications with the septic system <br /> that would be required to serve the site . <br /> 24 <br />