Browse
Search
Agenda - 06-12-2007-4ee revised SAPFO report 2007
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2007
>
Agenda - 06-12-2007
>
Agenda - 06-12-2007-4ee revised SAPFO report 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2018 9:15:09 AM
Creation date
12/31/2018 9:11:39 AM
Metadata
Fields
Template:
BOCC
Date
6/12/2007
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4ee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section I <br /> B . Building Capacity <br /> 1 . Responsible Entity for Suggesting Change ing- The Plann Directors , School <br /> Representatives , Technical Advisory Committee ( SAPFOTAC) will receive requested <br /> changes that are CIP related and adopted in the prior year . CIP capacity changes will be <br /> updated along with actual membership received in November of each year . <br /> Other changes will be sent to a ` Joint Action Committee ' of the BOCC and Board of <br /> Education, as noted in the MOU, who will make recommendations and forward changes <br /> (on the specific forms with justification) to the full Board of County Commissioners for <br /> review and action . These non- CEP changes would be updated in the upcoming November <br /> CAPS system recalibration and included in the SAPFOTAC report . <br /> 2 . Definition - "For purposes of this Memorandum, "building capacity" will be determined <br /> by reference to State guidelines and the School District guidelines (consistent with CIP <br /> School Construction Guidelines/policies developed by the School District and the Board <br /> of County Commissioners) and will be determined by a joint action of the School Board <br /> and the Orange County Board of Commissioners . As used herein the term " building <br /> capacity" refers to permanent buildings . Mobile classrooms and other temporary student <br /> accommodating classroom spaces are not permanent buildings and may not be counted in <br /> determining the school districts building capacity. " <br /> 3 . Standard for: Standard for: <br /> Chapel Hill Carrboro School District Orange County School District <br /> The original certified capacity for each of the The original certified capacity for each of the <br /> schools was certified by the respective schools was certified by the respective <br /> superintendent and incorporated in the superintendent and incorporated in the <br /> initialization of the CAPS system (Chapel Hill initialization of the CAPS system (Orange <br /> Carrboro School District Apri129 , 2002 - County School District April 30 , 2002 - Base) <br /> Base) <br /> Capacity changes were made each year as Capacity changes were made each year as <br /> follows : follows : <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.