Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br />U-6017 <br />47162.1.1 <br />47162.2.1 <br />47162.3.1 <br />Intersection improvements at NC 54 (East Harden St.) and <br />NC 49 (East Elm St.) in Graham <br />1/19/21 FY 2022 $1,216,000 Planning and design activities <br />underway <br />Chad Reimakoski <br />U-6009 <br />47144.1.1 <br />47144.2.1 <br />47144.3.1 <br />Widen and construct center turn lane on US70 (West Church <br />St) from Tarleton Ave. to Fifth Street in Burlington <br />6/15/21 FY2023 $11,319,000 Planning and design activities <br />underway <br />Chad Reimakoski <br />U-6013 <br />47158.1.4 <br />47158.2.4 <br />47158.3.4 <br />Widen NC 119 to multi-lanes from SR 1981 (Trollingwood- <br />Hawfields Rd)/ SR 2126 (Old Hillsborough Rd) to Lowes Blvd <br />(non-system) in Mebane. <br />7/19/22 FY 2024 $8,700,000 Planning and design activities <br />underway <br />Jennifer Evans <br />U-6014 <br />47159.1.1 <br />47159.2.1 <br />47159.3.1 <br />Widen SR 1716 (Graham-Hopedale Rd) to multi-lanes with <br />Bicycle/Pedestrian accommodations from SR 1720 (West <br />Hanover Rd) to Morningside Drive in Burlington <br />7/19/22 FY 2024 $15,200,000 Planning and design activities <br />underway <br />Chad Reimakoski <br />I-6009 <br />47962.1.1 <br />47962.2.1 <br />47962.3.1 <br />Interchange improvements at I-40/I-85 and SR 1158 <br />(Huffman Mill Road). Construct additional right turn lane on I- <br />40 WB Ramp and improve operations at SR 1308 (Garden <br />Road) intersection in Burlington <br />6/18/26 FY2027 $1,936,000 PE funding approved 6/5/18 Chris Smitherman <br />46