Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT <br />47771 Widen and improve right turn taper, radius and signal <br />upgrade at the intersection of NC 54 and SR 1945 <br />(Riverbend Rd.) in Graham. <br />Nov. 2018 Mar. 2019 $250,000 Planning and design activities <br />underway, scope reduction in <br />progress <br />Chad Reimakoski <br />48712 Planning and design of SR 1446 (Rockwood Ave.) from <br />existing end of maintenance to NC87 in Glen Raven. <br />Develop roadway, hydraulic and ROW plans <br />N/A N/A $500,000 Funding approved Sept. 2018 Chris Smitherman <br />47786 <br />SM-5707B <br />47903.2.1 <br />Intersection improvements on SR 1007 (Mebane Oaks Rd) at <br />SR 2126/2128 (Old Hillsborough Rd) south of Mebane. <br />Improvements include addition of left and right turn lanes, <br />radii widening, signal installation, resurfacing, and pavement <br />markings. <br />Jan. 2019 May. 2019 $898,500 Planning and design activities <br />underway, ROW acquisition <br />pending, CFI schedule pending <br />Chad Reimakoski <br />AV-5737 <br />46331.1.1 <br />46331.2.1 <br />Burlington-Alamance Regional Airport, Obtain navigation <br />easements and clear obstructions in runway 24 approach <br />Jan. 2019 FY2019 $1,200,000 Funding approved Feb. 2018, R/W <br />acquisition scheduled 10/27/18 <br />Rachel Bingham <br />W-5707D <br />44853.1.4 <br />44853.2.4 <br />44853.3.4 <br />Safety improvements for curve on NC 49 located between <br />Buckingham Mountain Road (non-system) and SR 2363 <br />(Beale Road) in Snow Camp. <br />5/16/19 FY2020 $200,000 R/W <br />$450,000 CON <br />Planning and design activities <br />underway <br />Chad Reimakoski <br />I-5711 <br />50401.2.1 <br />50401.3.1 <br />Interchange improvements at I-40/I-85 and SR 1007 <br />(Mebane Oaks Rd) in Mebane <br />9/17/19 FY2022 $17,446,000 Planning and design activities <br />underway <br />Laura Sutton <br />U-6010 <br />47145.1.1 <br />47145.2.1 <br />47145.3.1 <br />Intersection improvements at US 70 (South Church Street) <br />and SR 1226/SR 1311 (University Drive) in Burlington <br />10/20/20 FY2021 $1,300,000 Planning and design activities <br />underway <br />Brian Ketner <br />U-6011 <br />47146.1.1 <br />47146.2.1 <br />47146.3.1 <br />Intersection improvements at US 70 (South Church Street) <br />and SR 1158 (Huffman Mill Rd) in Burlington <br />11/17/20 FY2021 $1,300,000 Planning and design activities <br />underway <br />Brian Ketner <br />U-5844 <br />50234.1.1 <br />50234.2.1 <br />50234.3.1 <br />Construct multi-lanes on NC62 from SR 1430 (Ramada <br />Road) to US 70 (South Church Street) in Burlington <br />11/17/20 FY2021 $10,900,000 Planning and design activities <br />underway, R/W acquisition <br />tentatively scheduled for 8/30/19 <br />Chris Smitherman <br />45