Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />ER-2971 <br />3607.3.08 <br />Install widening, curb and gutter, and construct sidewalk on <br />NC 49 (Main St.) between the east side of the Haw River <br />Bridge and Stone St. in Haw River <br />1/27/16 Oct. 2018 $275,000 LAP- Under construction - 100% <br />complete, final inspection pending <br />Donnie Huffines <br />SS-4907BS <br />44894.1.1 <br />44894.2.1 <br />44894.3.1 <br />Installation of traffic signal at the intersection of US70 and SR <br />1114 (Buckhorn Road) East of Mebane. <br />5/31/17 Dec. 2018 $40,500 R/W <br />$43,200 CON <br />Utility relocations complete, Right of <br />entry complete, R/W acquisition <br />pending <br />Dawn McPherson <br />SS-4907BQ <br />44757.1.1 <br />44757.2.1 <br />44757.3.1 <br />Intersection improvements (All Way Stop) at SR 1005 <br />(Greensboro-Chapel Hill Road) at SR 2369 (Sylvan <br />School Road) and SR 2371 (Pleasant Hill Road) in Snow <br />Camp. <br />8/15/17 Fall 2018 $22,500 R/W <br />$153,000 CON <br />4-way stop installation and flasher <br />completed 4/17/18, R/W certified <br />9/25/18, utility relocations underway, <br />widening Fall 2018 <br />Chris Smitherman <br />Dawn McPherson <br />SS-4907CB <br />47675.1.1 <br />47675.2.1 <br />47675.3.1 <br />47721 <br />Installation of traffic signal at the intersection of SR 1530 <br />(Burch Bridge Road) at SR 1515 (Flora Avenue) north of <br />Burlington. <br />7/2/2018 Dec. 2018 $107,500 Traffic signal activated, Project <br />completed pending final RTE <br />inspection <br />Dawn McPherson <br />U-6015 <br />47160.1.1 <br />47160.2.1 <br />47160.3.1 <br />Burlington-Graham Signal System upgrade 9/18/18 FY2020 $11,851,000 R/W Certified 7/18/2018, Let and <br />awarded contract to ALS of North <br />Carolina <br />Sherry Yow <br />U-5843 <br />50233.2.1 <br />50233.3.1 <br />Intersection improvements at US 70 (South Church Street) <br />and SR 1817 (Graham-Hopedale Road) in Burlington <br />11/15/18 FY2020 $2,300,000 R/W Certified, Utility relocations <br />pending, Project let and received no <br />bids, Re-let 11/15/18 <br />Chad Reimakoski <br />ER-2971 <br />3607.1.16 <br />3607.3.16 <br />Construct sidewalk on the east side of SR1716 (N. Graham <br />Hopedale Rd) between Wilkins St. and North Ashland Drive <br />in Burlington <br />Nov. 2018 Apr. 2019 $70,000 LAP, Let schedule pending Donnie Huffines <br />NCDOT PROJECTS LOCATED IN BGMPO - UNDER DEVELOPMENT 44