Orange County NC Website
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />SS-4907CD <br />47936.1.1 <br />47936.2.1 <br />47936.3.1 <br />Horizontal curve improvements on SR 1710 (Old NC 10) <br />west of SR 1561/SR 1709 (Lawrence Road) east of <br />Hillsborough. Improvements consist of wedging pavement <br />and grading shoulders. <br />12/5/2019 Spring 2020 $261,000 Planning and design activities <br />underway <br />Chad Reimakoski <br />I-3306A <br />34178.1.3 <br />34718.2.2 <br />34178.3.3 <br />Wideing I-40 from I-85 in Orange Co. to Durham Co. line (US <br />15/501 Interchange) <br />TBD TBD $98,800,000 Planning and design activities <br />underway, No schedule at this time <br />other than CE doucment scheduled <br />for 12/28/2018 <br />Laura Sutton <br />P-5701 <br />46395.1.1 <br />46395.3.1 <br />Construct Platform, Passenger Rail Station Building at <br />Milepost 41.7 Norfolk Southern H-line in Hillsborough <br />6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020, <br />Coordinate with U-5848 <br />Matthew Simmons <br />R-5821A <br />47093.1.2 <br />47093.2.2 <br />47093.3.2 <br />Construct operational improvements including <br />Bicycle/Pedestrian accommodations on NC 54 from SR 1006 <br />(Orange Grove Road) to SR 1107 /SR 1937 (Old Fayetteville <br />Road). <br />6/21/2022 FY2024 $3,924,000 Planning and design activities <br />underway, coordinating with NC54 <br />West Corridor Study <br />Jennifer Evans <br />U-5848 <br />50237.1.1 <br />50237.2.1 <br />50237.3.1 <br />Extend SR 1006 (Orange Grove Road) on new location with <br />Sidewalks and bike lanes from existing SR 1006 (Orange <br />Grove Road) to US 70 Business in Hillsborough. <br />3/21/2023 FY 2025 $5,326,000 Planning and Design activities <br />underway, Coordinate with P-5701 <br />and U-5845 <br />Laura Sutton <br />I-3306AC <br />34178.1.6 <br />34178.2.5 <br />434178.3.9 <br />Interchange improvements at I-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities <br />underway <br />Laura Sutton <br />I-5959 <br />45911.1.1 <br />45911.3.1 <br />Pavement Rehabilitation on I-85 from West of SR 1006 <br />(Orange Grove Road) to Durham County line <br />11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17 Chris Smitherman <br />I-5967 <br />45917.1.1 <br />45917.2.1 <br />45917.3.1 <br />Interchange improvements at I-85 and SR 1009 (South <br />Churton Street) in Hillsborough <br />1/16/2024 FY 2027 $20,700,000 Planning and Design activities <br />underway <br />Laura Sutton <br />38