TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />SS-4907BS <br />44894.2.1 <br />44894.3.1 <br />Installation of traffic signal at the intersection of US70 and <br />SR 1114 (Buckhorn Road) East of Mebane. <br />5/31/2017 Dec. 2018 $40,500 R/W <br />$43,200 CON <br />Utility relocations complete, Right of <br />entry complete, R/W acquisition <br />pending <br />Dawn McPherson <br />U-5846 <br />50236.1.1 <br />50236.2.1 <br />50236.3.1 <br />Construct a roundabout at SR 1772 (Greensboro Street) and <br />SR 1780 (Estes Drive) in Carrboro. <br />9/6/2018 FY2021 $775,000 1st bid opening received no bids, <br />Re-let 9/6/18 bids exceeded <br />engineers estimate, project cost <br />evalution being performed <br />Chad Reimakoski <br />W-5707C <br />44853.1.3 <br />44853.3.3 <br />47490 <br />Revise pavement markings and overhead lane use signs for <br />removal of inside lane drop configuration on I-40 Westbound <br />in vicinity of US 15-501 interchange. Resurfacing I-40 WB <br />by use of contingency funds <br />11/1/2018 Aug. 2019 $395,000 Planning and design activities <br />underway, re-let due to bids <br />exceeded engineers estimate, new <br />let date 11/1/18 <br />Chad Reimakoski <br />47798 Increase length of existing turn lane / slip ramp and improve <br />existing radius in the SE quadrant of US 70 Business/ NC 86 <br />at US 70 Bypass in Hillsborough <br />1/17/2019 Jun. 2019 $189,000 Planning and design activities <br />complete, R/W certified 9/18/18 <br />Chad Reimakoski <br />U-5847 <br />50238.1.1 <br />50238.2.1 <br />50238.3.1 <br />Intersection improvements at SR 1010 (West Franklin St.) <br />and SR 1771 (Merritt Mill Rd)/SR1927 (Brewer Lane) in <br />Chapel Hill / Carrboro. <br />1/17/2019 FY 2020 $775,000 Planning and design activities <br />underway, bike/ped improvements <br />to be completed under project 48283 <br />Chris Smitherman <br />48283 Remove and replace existing curb & gutter and sidewalk, <br />add pedestrian signals, concrete island, and signal <br />modifications on SR 1010 (E. Main St / W. Franklin St) from <br />Brewer Ln to Graham St. in Chapel Hill and Carrboro <br />5/31/2019 Sept. 2019 $250,000 Funds approved 9/6/18, <br />Construction May 2019 <br />Chris Smitherman <br />B-4962 <br />40174.1.1 <br />40174.2.1 <br />40174.3.1 <br />Replace Bridge #46 over Eno river on US 70 Bypass 4/16/2019 FY 2021 $5,826,000 Planning and Design activities <br />underway, ROW acquisition - 15% <br />complete <br />Kevin Fischer <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />Attachment 1 37