Orange County NC Website
Article 5: Usk <br /> Section 5.7: Standards for Recreational Uses <br /> (ii) A specific statement of the goals and objectives, i. ., exactly <br /> what steps will be taken to compensate for to abitat, etc.; <br /> (iii) Detailed descriptions in the form of gra i g plans, construction <br /> plans, and planting plans to illustra ow the objectives will be <br /> carried out; <br /> (iv) monitoring and maint nce plan to measure success of the <br /> mi ation based on ated objectives. Include a list of parties <br /> respon le for nitoring and maintenance, a schedule for <br /> each, and results will be reported at least twice a year to the <br /> Planni and In ections Department; <br /> (v) Ian showing how t site will be protected from impacts by <br /> human and unwanted ani intrusion, alternate plant species <br /> and construction methods that uld be used in the event <br /> adjustments or substitutions are ne ed until the mitigation area <br /> is established; and <br /> (vi) A financial guarantee is required for the total c t of the <br /> mitigation project. Once the installation is complete, 0% of the <br /> amount of the bond, letter of credit, or escrow will be h for 12 <br /> months or until the site is established, whichever is greater. <br /> (E) Construction <br /> (1) Drainage <br /> (a) All drainage structures shall be installed and maintained according to the <br /> approved Stormwater Management Plan. <br /> (b) Golf courses that include structural stormwater measuresstormwater <br /> control measures (SCMs) shall comply with the requirements in Section <br /> 6.14 of this Ordinance. <br /> (2) Grading and Erosion Control <br /> (a) Plans for grading and erosion control must comply with s dards <br /> contained in this Ordinance and the Orange County sion and <br /> Sediment Control Manual; <br /> (b) Whenever practical, construction shall be ph ed to minimize <br /> disturbance and sedimentation; <br /> (c) Sediment control measures must be roperly installed to filter sediment <br /> runoff during construction a shall be maintained until grading is <br /> com to and a permanent v etative cover has been established and <br /> all slope tabilized; and <br /> (d) Permanent Ian ca i g, groundcover, mulch, etc. must be installed as <br /> soon as practica r construction activities for each phase are <br /> completed. <br /> (3) Solid Waste M agement <br /> (a) Th olid Waste Management PI submitted as part of the Resources <br /> anagement Plan shall include the m od(s)of disposal and recycling <br /> of construction debris. <br /> (F) Opera ' n and Maintenance <br /> ( Integrated Pest Management(IPM) <br /> (a) An integrated pest management plan (IPM) shall be establi ed based <br /> on site conditions, soils, pesticide properties and management actices. <br /> Orange County, North Carolina—Unified Development Ordinance Page 5-71 <br />