Orange County NC Website
20051222080437660 <br /> i °kR03938 Py�581 <br /> 1212212M Mi6 8PM 4111 <br /> review prior to construction. Grantee will make every effort to review and either <br /> approve or reject the plan within 60 days of submission. <br /> ii. One l Wetland Viewing Platform. A wetland viewing platform may be <br /> constructed within the Easement Area within the acceptable building location <br /> ("ABL") identified on Exhibit B. The platform may not be more than 20 feet by <br /> 20 feet square, and must be constructed of non-toxic, biodegradable materia[s. <br /> The platform will be designed and built to meet accessibility as defined by the <br /> Americans with Disabilities Act(ADA), Grantor must submit a construction plan <br /> to Grantee for review prior to construction. Grantee will make every effort to <br /> review and either approve or reject the plan within 60 days of submission. <br /> All construction permitted in section F shall avoid or minimize damage to woody vegetation <br /> within the easement area. <br /> G. Roads and Trails. There shall be no construction of roads, trails, walkways, or <br /> paving in the Easement Area except as set forth in Section F above, Existing roads or trails <br /> located in the Easement Area may be maintained by Grantor in order to minimize runoff, <br /> sedimentation, and for access to the interior of the Property for management, maintenance, <br /> stewardship purposes, or undeveloped recreation and educational uses of the Easement Area. <br /> Existing roads, trails, or paths may be maintained with loose gravel, other pervious surfaces, or <br /> permanent vegetation to stabilize or cover the surfaces. <br /> H. Signs. No signs shall be permitted in the Easement Area except interpretive signs <br /> I describing restoration activities and the conservation values of the Easement Area, signs <br /> identifying the owner of the Property and the holder of the Conservation Easement,signs giving <br /> directions, or signs prescribing rules and regulations for the use of the Easement Area may be <br /> t allowed. <br /> 1. Dumping or Storing. Dumping or storage of soil, trash, ashes, garbage, waste, <br /> abandoned vehicles, appliances or machinery, or other material in the Easement Area is <br /> prohibited. <br /> i <br /> I Grading, Mineral Use, Excavation, Dredging. There shall be no grading, <br /> filling, excavation, dredging, mining, or drilling;no removal of topsoil, sand, gravel, rock,peat, <br /> minerals,or other materials. <br /> K. Water Quality and Drainage Patterns, There shall be no diking, draining, <br /> dredging, channeling, filling, leveling, pumping, impounding or diverting, causing, allowing or <br /> permitting the diversion of surface or underground water. No altering or tampering with water <br /> control structures or devices, or disruption or alteration of the restored, enhanced, or created <br /> drainage patterns. All removal of wetlands,polluting or discharging into waters,springs, seeps, <br /> j or wetlands, or use of pesticide or biocides is prohibited. In the event of an emergency <br /> interruption or shortage of all other water sources, water from within the Easement Area may <br /> temporarily be used for good cause shown as needed for the survival of livestock and agricultural <br /> production, <br /> 4 <br /> 81 <br />