Orange County NC Website
B. STATE PERMITS REQUIRED <br /> 1. Does the project involve the mining of earth products? No <br /> If so, how many cubic feet of material are expected to be <br /> excavated? <br /> Has an application for a Mining Permit been submitted to <br /> NCDRCD? No <br /> Please attach map indicating expected extent of proposed activity. <br /> 2. Does the project involve generation or storage of hazardous or <br /> toxic wastes, as identified by the Environmental Protection <br /> Agency? (A listing of all hazardous materials is available from the <br /> Planning Department) <br /> Describe the wastes to be generated. NIA <br /> How much material is expected to be generated per month? <br /> NIA <br /> Will any material be treated onsite? <br /> Volume? <br /> Will any material be stored onside? <br /> Volume? <br /> Where will disposal of the material take place? <br /> NIA <br /> How will materials be transported to the disposal site? <br /> NIA <br /> What measures are proposed to protect water quality and air <br /> quality in case of spills? <br /> NIA <br /> 46 <br />