Orange County NC Website
f S Y A <br /> Consultants <br /> La«o 0Mr114,9PURNT sowwLTANTS <br /> EXHIBIT #2 <br /> Project: Camp Chestnut Ridge - Orange County, NC <br /> LPP Wastewater System <br /> Period: Summer Camp 2017 <br /> Design Flow: 2850 <br /> Pump Rate: 1321.6 <br /> Calculated Inferred <br /> Pumped No. of Weekend <br /> Volume Days in Day Usage <br /> Day Date (gallons) Period (gallons) Camp Activity Notes <br /> Sat. 6/10/2017 <br /> Sun. 6/11/2017 Summer Camp Week 1 <br /> Mon. 6/12/2017 1546 2 Resident & Day Camp <br /> Tues, 6/13/2017 1097 1 <br /> Wed. 6/14/2017 1692 1 <br /> Thu. 6/15/2017 2432 1 <br /> Fri. 6/16/2017 <br /> Sat. 6/17/2017 <br /> Sun. 6/18/2017 Summer Camp Week 2 <br /> Mon. 6/19/2017 4599 4 Resident& Day Camp <br /> Tues. 6/20/2017 2101 1 <br /> Wed. 6/21/2017 1004 1 <br /> Thu. 6/22/2017 1004 1 <br /> Fri. 6/23/2017 1520 1 <br /> Sat, 6/24/2017 1018 1 1018 <br /> Sun. 6/25/2017 Summer Camp Week 3 <br /> Mon. 6/26/2017 Resident and Day Camp <br /> Tues. 6/27/2017 4057 3 <br /> Wed. 6/28/2017 1322 1 <br /> Thu. 6/29/2017 1295 1 <br /> Fri. 6/30/2017 1467 1 <br /> Sat. 71l/2017 872 1 872 <br /> Sun. 7/2/2017 476 1 476 Summer Camp Week 4 <br /> Mon. 7/3/2017 582 1 Resident& Day Camp <br /> Tues. 7/4/2017 1057 1 <br /> Wed. 7/5/2017 1031 1 <br /> Thu. 7/6/2017 1031 1 <br /> Fri. 7/7/2017 1018 1 <br /> Sat, 7/8/2017 <br /> Sun. 7/9/2017 Summer Camp Week 5 <br /> Mon. 7/10/2017 2088 3 Resident & Day Camp <br /> Tues. 7/1 1/2017 1057 1 <br /> Wed, 7/12/2017 1163 1 <br /> Thu. 7/13/2017 1150 1 <br /> Fri. 7/14/2017 1626 1 <br /> 299 <br />