Browse
Search
BOA agenda 121018 - cancelled due to weather
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2018
>
BOA agenda 121018 - cancelled due to weather
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 12:37:40 PM
Creation date
12/27/2018 12:15:19 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL INFORMATION <br /> ❑ PERMITS 1 AUTHORIZATIONS ARE SUBJECT TO REVOCATION IF THE SITE PLAN,PLAT,OR INTENDED USE <br /> CHANGES OR IF THE SITE IS ALTERED. SUBSEQUENT CHANGES TO THE SITE PLAN OR INFORMATION ON <br /> THE APPLICATION WILL REQUIRE A NEW APPLICATION AND ADDITIONAL FEES <br /> ❑ NO REFUNDS WILL BE GIVEN FOR SERVICES THAT ARE ALREADY RENDERED OR INITIATED. <br /> ❑ PAYMENT AS INDICATED IN THE INDIVIDUAL SECTIONS MUST ACCOMPANY THE APPLICATION IN <br /> ORDER TO PROCESS THE APPLICATION AND SCHEDULE A FIELD VISIT BY STAFF <br /> ❑ A WELL PERMIT OR A CONSTRUCTION AUTHORIZATION MUST BE ISSUED PRIOR TO ANY <br /> CONSTRUCTION OR REPAIR OF A WELL OR A WASTEWATER SYSTEM. <br /> ❑ A FINAL INSPECTION OF THE WELL AND WASTEWATER SYSTEM MUST BE COMPLETED AND APPROVED <br /> BY THE OCHD STAFF PRIOR TO PLACING EITHER INTO USE OR OCCUPYING A NEW HOME. <br /> ❑ YOU MUST CONTRACT WITH A WELL CONTRACTOR WHO IS REGISTERED IN ORANGE COUNTY AND <br /> HOLDS A VALID CERTIFICATION FROM THE STATE OF N.C. (A LIST IS AVAILABLE) <br /> ❑ YOU MUST CONTRACT WITH A SEPTIC CONTRACTOR WHO IS REGISTERED TO INSTALL OR REPAIR <br /> SYSTEMS IN ORANGE COUNTY. (A LIST IS AVAILABLE) <br /> ❑ EVERY APPLICATION FOR A CONSTRUCTION AUTHORIZATION MUST BE ACCOMPANIED BY EITHER A <br /> VALID IMPROVEMENT PERMIT OR BY AN APPLICATION FOR AN IMPROVEMENT PERMIT. <br /> ❑ ANY CHANGES THAT ARE PROPOSED FOR AN EXISTING PERMIT REQUIRES A NEW APPLICATION. <br /> ❑ FOR AN IMPROVEMENT PERMIT,IF A HOUSE SITE OR PROPOSED SEPTIC SITE IS NOT DESIGNATED ON <br /> THE SITE PLAN,ONE WILL BE ASSIGNED BY THE OCHD STAFF. <br /> EXPIRATION OF PERMITS I AUTHORIZATIONS <br /> WELL PERMITS S YEARS <br /> EXISTING WELL/SYSTEM AUTHORIZATIONS 1 YEAR <br /> IMPROVEMENT PERMITS 5 YEARS-WHEN A SITE PLAN IS SUBMITTED <br /> NO EXPIRATION-WHEN PLAT' [three copies] IS SUBMITTED <br /> CONSTRUCTION AUTHORIZATIONS 5 YEARS MAXIMUM OR WHEN ACCOMPANYING <br /> IMPROVEMENT PERMIT EXPIRES WHICHEVER COMES <br /> FIRST. <br /> 'Plat=prepared by a Registered Land Surveyor to a scale of 1" 60'showing the facility,apptwtenances,site for the septic system,water supplies, <br /> and surface water. Or an approved and recorded subdivision plat accompanied by a site plan drawn to scale. <br /> NOTES: <br /> 209 <br /> OCHD 05/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.