Browse
Search
BOA agenda 121018 - cancelled due to weather
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2018
>
BOA agenda 121018 - cancelled due to weather
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 12:37:40 PM
Creation date
12/27/2018 12:15:19 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> } <br /> • <br /> 7. A H-connection ((3)2"gate-valves)shall be installed in the supply lines in a proper <br /> valve vault(access riser is acceptable)to enable manual switching of the drainfields due <br /> to pump/control panel alternating failure. <br /> 8. 2" sch. 40 shall be used for the supply lines(Approx. 200 feet each). The lines shall <br /> be buried a minimum of 18". 1f rock is encountered in the ditch,the 2" lines shall be <br /> sleeved to prevent abrasion of the pipe in the rocky areas. <br /> 9. The pressure manifold will be 4"sch. 80 with 1/2"sch. 40 taps on at least 9"centers. <br /> Each tap shall have a 1/4 turn PVC ball-valve. The flow shall be regulated with a 2" <br /> PVC gate-valve. There shall be 2 PVC unions for easy removal of the manifold from the <br /> manifold vault. 3"PVC sch. 40 shall be used from the manifold vault to the nitrification <br /> lines. (See Pressure Manifold Standard Specification Sheet). <br /> 10. The manifold vault shall be constructed of concrete or equal and equipped with a <br /> easily removable cover for inspection/maintenance and to prevent the collection of rain <br /> into the vault. <br /> 11. In order to prevent erosion of the drainfield,the nitrification lines area shall be <br /> seeded with an acceptable type of grass for the area. Straw shall be placed over the <br /> seeded area. <br /> 12. The existing septic tank shall be pumped and properly abandoned upon approval of <br /> the new repair system. <br /> G lgreglfettm%-Lrnp\chesriip <br /> 142 <br />
The URL can be used to link to this page
Your browser does not support the video tag.