Browse
Search
BOA agenda 121018 - cancelled due to weather
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2018
>
BOA agenda 121018 - cancelled due to weather
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 12:37:40 PM
Creation date
12/27/2018 12:15:19 PM
Metadata
Fields
Template:
BOCC
Date
12/10/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Standards TS-I or TS-II may be used on sites classified as Suitable or Provisionally Suitable for conventional, <br /> modified, alternative or innovative systems in accordance with 15A NCAC 18A .1900 et seq. The following <br /> modifications to siting criteria,vertical or horizontal separation distance requirements shall be acceptable: <br /> 1. Minimum initial vertical separation siting criteria and minimum vertical separation distances for trench bottoms <br /> specified in Rules.1955(m),.1956,and.1957 may be reduced for ground absorption systems r e c e i v i n g <br /> effluent from pretreatment systems meeting TS-I or TS-II as follows: <br /> •by a max i m um-QjC 25 percent for gravity dosed drainfields, and <br /> •by a maximum of 50 percent for pressure dosed drainfields(LPP or DRIP distribution), <br /> when all of the following conditions are met: <br /> a. the initial vertical separation siting criteria shall not be reduced to less than 12 inches from the <br /> soil surface to rock or any unsuitable soil horizon, <br /> b. the trench bottom vertical separation distance shall not be reduced to less than 12 inches to rock <br /> or tidal water, <br /> C. a Pressure-Dosed Sand Filter pretreatment system meeting Treatment Standard I1(TS-II)shall be <br /> used in conjunction with any reduction to any soil wetness_c_�dition in the initial vertical <br /> separation siting criteria or the trench bottom vertical separation distance, <br /> d. the site shall be evaluated by a Licensed Soil Scientist(see Section 1,below), <br /> e. with the exception of horizontal setback reductions from Drainage Systems,no other reductions <br /> in horizontal setbacks or increases in Long Term Acceptance Rates, as provided for in <br /> Sections DA and E.2, below, shall be used when any reductions in initial vertical separation <br /> siting criteria or trench bottom vertical separation distances are utilized. Furthermore, no <br /> reduction in trench bottom area shall be allowed for chambered or polystyrene aggregate systems <br /> when any of these reductions are utilized. These reductions are also not applicable to a PPSPS <br /> system sized in accordance with Rule.1956(3)(a)(ii),and <br /> f. whenever any of the above reductions in initial vertical separation criteria or trench bottom <br /> vertical separation distances are utilized,the property line minimum horizontal setback <br /> distance shall be increased to 25 feet. <br /> 2. Drainage Systems: When a Pressure-Dosed Sand Filter pretreatment system meeting TS-I or TS-1I is to be <br /> utilized, drainage may by used on sites with Group III Soil Texture, and soils with Provisionally Suitable (or <br /> Suitable) structure are allowed within the vertical separation zone. A groundwater lowering system may also be <br /> used to meet the siting criteria or vertical separation requirements for soil wetness conditions for fill systems <br /> specified in Rule .1957(b)(1). Site evaluation by a Licensed Soil Scientist shall be required, and the drainage <br /> system shall be designed by a person with demonstrated knowledge of drainage systems(see Section 1,below). <br /> 3. Saprolite Systems: When a Pressure-Dosed Sand Filter pretreatment system meeting TS-I or TS-I1 is to be <br /> utilized,saprolite with sandy clay loam texture may be used. The maximum LTAR for sandy clay loam saprolite <br /> texture shall be 0.2 gpd/ft' for conventional trenches and 0.10 gpd/ft for LPP trenches. Nitrification trenches in <br /> saprolite may be installed up to five feet deep. Site evaluation by a Licensed Sail Scientist or Professional <br /> Geologist shall be required(see Section I,below). <br /> 4. Minimum horizontal setbacks shall be as specified in Rule.1950,except as provided for in Table 1. <br /> Table 1. Minimum horizontal setbacks for ground absorption systems when <br /> Pressure-Dosed Sand Filter Pretreatment Systems meeting TS-1 or TS-lI are used.' <br /> 3 <br /> 131 <br />
The URL can be used to link to this page
Your browser does not support the video tag.