DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> Mork Change Directive No. 001 <br /> Date of issuance: 12-20-2017 Effective Date: 12-20-2017 <br /> Owner: orange County Owner's Contract No.: C1P 30044 <br /> Contractor: J.F.Wilkerson Contracting Co.,Inc. Contractor's Project No.. <br /> Engineer: McGill Associates Engineer's Project No_: 16,01904 <br /> Project: Hand Sewer to Mebane Phase 2 Contract Name: Line".B"Design Revision <br /> Extension <br /> Contractor is directed to proceed promptly with the following change(s): <br /> Description: Contractor is to install"Line B"to SSMH#30.Section from SSMH#15 to SSMH#29 is to be installed as <br /> shown in the construction documents.Section from SSMH#29 to SSMH##30 is to be installed at a revised slope of <br /> .47/.The location for SSMH#30 does not change however,SSMH30 invert out is now 628.70'.Additionally,a 4" <br /> sewer service to the right of way with cleanout and cap to grade is to be installed at station 4+60 to serve 301 <br /> Center Street, PIN 9844960792. <br /> Attachments:Norse. <br /> Purpose for Fork Change Directive: <br /> Directive to proceed promptly with the Work described herein,prior to agreeing to changes on Contract Price and <br /> Contract Time,is issued due to:[check one or both of the following] <br /> ❑Non-agreement on pricing of proposed change. <br /> EK Necessity to proceed for schedule or other Project reasons. <br /> Estimated Change in Contract Price and Contract Times(non-binding,preliminary): <br /> Contract Price $ To Be Determined [increase] [decrease]. <br /> Contract Time To Be Determined (increase] [decrease]. <br /> Basis of estimated change in Contract Price: <br /> Lump Sum ® Unit Price � <br /> ❑ Cost of the Mork ❑ Other <br /> RECOMMENDED: AUTHORIZED BY: o sC O RECEIVED: <br /> 0o usgned av •- <br /> ocu <br /> �b�+ osinn By• Ll. ea�oav'� � Y <br /> Authorized Signature) Owner(Author ature y _ ..-.___-.. , __.torized Signature) <br /> Title: i2/14/2018 Title.�� f Title: <br /> gate: r�� 20,t7 Date: /• �// 2/14/2018 Date: 12/14/2018 <br /> Approved b <br /> m s�etl <br /> By: �+�+►� ate: �� s. 12/17/2018 <br /> Title: <br /> FJCDC C-W,Work Change Directive. <br /> Prepared and published 2013 by the Engineers Joint Contract Documents Committee. JWCD 001 <br /> Page 1 of 1 <br />