Orange County NC Website
DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> Change Proposal Form <br /> Project: Efland SS to Mebane Phase 2 <br /> Contract: 16.01904 <br /> Contractor: JF Wilkerson Contracting,Inc. <br /> Utility <br /> Construction Proposal No. 015 <br /> Project No. CIP 30044 <br /> Contractor No. C077 <br /> Description of Change: <br /> Time Extension <br /> Notice to Proceed Issued 9 days after Contract Execution <br /> Item Date <br /> Contract Execution Date August 28,2017 <br /> Notice to Proceed Rec'd by Contractor August 31,2017 <br /> Time Delay 3 Days <br /> Time Extension Request 9 Days <br /> Time Extension Approved 3 Days <br /> The contractor agrees to perform the work outlined in thes change proposal for the amount specified above and in accordance with the <br /> Contract documents if the work is authorized by the Owner. <br /> Contractor Signature: C'� Date 12/14/2018 Approval Recommended by Engineer: �,�r,�,� Date 1211412018Owner Representative: ,p Date 12/17/2018 <br /> C 12/14/2018 <br /> Approval Recommended: Date <br /> This item captures the time lapsed from the signing of the Notice to Proceed to when the <br /> Contractor received an executed copy of the Contract.There was a 3-day delay in Contractor <br /> receiving an executed Contract once the Notice to proceed had been signed,delaying the <br /> Contractor beginning work.This claim of time has been reviewed by the Engineer and is believed <br /> to be reasonable and appropriate. <br /> CPR 015 <br />